|
• i1
<br /> ,I
<br /> L.,-)
<br /> i
<br /> Run Date: 615/2018. City of Everett-Public Works Department Cutoff Date: 8/24/2018
<br /> Time: 2:14 PM Gontr^act:6samate Voucher .
<br /> • For Work Order.#36:1.1
<br /> Project: 35.1 • Contractor: MCICLURE•&SONS
<br /> THREE LAKES VALVE BY-PASS Estimate#9 1.6714 COUNTRY CLUB DRIVE
<br /> WO 36.11 BID:$1,213,396,60 • •MILL CREEK,WA.98012
<br /> 1 TOTAL BID:$1,213,396.60 I
<br /> Unit Plan Total Previous Present ! Total Previous Present ' i
<br /> Item# Description Units Price Quantity Quantity Quantify ' Quantity 'Amount Amount Amount
<br /> 0001 BASE BID LS ,,1.30,446,00 1,00 1.0000 0.9991 0:0009' ; 1,120,448,00 1.,129,42840. 1,017.40
<br /> 0002' ADDITIONAL MANWAY,24" EA 7,350.00' 1,00 0,0000 0.0000 0.0000 0.00 0.00 0.00
<br /> 0003 INCENTIVE BONUS I.S. 1.5000;00 1.00 00000 0:0000 ' 0.0000 0,00 0.00 0,00
<br /> 0101 ADDITIONAL•MATERIALS.COSTS LS 11,180.40. 1.00 1.0000 1.0000 0:0'000 11,180.40• 11,180.40 0,00
<br /> 0102 ADDITIONAL RESTRAINED WELDS. LS 9,128.00: 1.00 1.0000 1.0000 0,0000 9,128.00' 9,128;;00. 0:00
<br /> 0103 ADITIONALLAB'ORAND•EQUIPMENT LS 12,547.69 1,00' 1.0000 1.:0000 0:0000 '12,547,69 12,54.7,69 0,00.
<br /> • COSTS
<br /> •0104 EARLY INCENTIVE BONUS ' LS 16,000.00' 1,00 1.0000 1.0000 0,0000 15';000:00 15,000:00 '0.00
<br /> •
<br /> 0108 P oJECT.�CHANGEs L$ 8,402.64 1.00 1,0000 •0.0000 1.0000 � 8;402.64 0,00' 8,402•.64' • a)
<br /> • 0106 PROJECT,ELECTRICAL CHANGES . LB 26',891.87 1.00 1.0000' 0:0000 1:0000 1 28;891,.87 0;00 26,691:87 '- F
<br /> •
<br /> i Work Order Totals:- .1:213;396,60 1,177;284.69• 36,111;91
<br /> 1
<br /> '
<br /> .
<br /> . iI
<br />
|