Laserfiche WebLink
SNOHOIOISH <br />HEALTH <br />\tr DISTRICT <br />December 17, 2007 <br />Gabriel and Kathryn Valencia <br />P O Box 2599 <br />Everett, WA 98213 <br />ENVIRONMENTAL HEALTH DIVISION <br />3020 Rucker Avenue, Suite 104 <br />Everett, WA 9B201-3900 <br />425.339.5250 FAX:425.339.5254 <br />Deaf/Hard of Hearing: 425.339.5252 (TTY) <br />Subject: Proposed, Big Easy BBQ, 6919 Evergreen Way, Everett <br />Dear Mr, and Ms. Valencia: <br />Your plans have been received; however the plans cannot be approved as submitted. The <br />following information is needed prior to further plan review. <br />l . Submit a copy of proposed menu. <br />2. A description of the food preparation process (HACCP) for the three anticipated most <br />popular food items from your menu must be submitted. Examples for the HACCP are <br />enclosed. Any proposed advanced preparation of foods requiring cooling and or any cooling <br />of leftover foods must be included as HACCP menu items. An example HACCP is included <br />in the enclosed Plan Review information packet. <br />3. Submit a complete and accurate list of all food the food service equipment, including sinks <br />and counter top equipment, noting manufacturer and model numbers. <br />4. No handwash sink is indicated on the floor plan in the dishwashing area. A handwash sink is <br />required in this area. The location of the handwash sink must be shown on the floor plan. <br />5. Only one food preparation sink is indicated on the floor plan. A food preparation sink is <br />needed for vegetable preparation. Food preparation that includes washing or thawing under <br />running water of raw meat, poultry and/or seafood requires the installation of a separate food <br />Vrtio an sink for raw meat, poultry and or seafood preparation. If vegetable preparation <br />w meat, poultry and/or seafood preparation will be done, then an additional and <br />separate food preparation sink must be installed. The location of the additional food <br />preparation sink must be shown on the floor plan. <br />6. Three server stations are shown on the floor plan, two on the main floor and one on the <br />second floor. What equipment will be at the server stations? <br />7. No ventilation flood is indicated on the floor plan for the cooking equipment in the kitchen. A <br />ventilation ]rood is required. The location of the ventilation hood must be shown on the floor <br />plan. The manufacturer name and specifications for the ventilation hood must be submitted. <br />8. No barriers are shown on the floor plan to prevent public access to the outside BBQ smoker. <br />What method will be used to prevent public access to this area? <br />9. Submit a finish schedule (final surfaces) for floors, walls, ceilings, counters and cabinets. <br />10. Submit the plumbing details or schedule. <br />11. Submit a revised floor plan, drawn to scale, showing location of all equipment, plumbing <br />fixtures and the like that includes the required additional sinks and information. The scale of <br />the drawing should be 1/4 inch equals 1 foot. <br />12. Please refer to the enclosed Plan Review information packet for additional information and <br />sample floor plan drawing. <br />