|
H C D E E5 � G
<br /> �EGE�1D
<br /> ❑T - TEMP. SENSOR
<br /> SEE SHEET 1 M10-26
<br /> -- -- _ - - -- -- -- -- _ -- _-- -- _ - - -- -- _ __ _� �� _ __ m_ __ � � - THERMOSTAT
<br /> 24x24 c4" P � TED FI�TER � /�
<br /> 1 � 14'-7" AFF � BO =12�-11" AFF 4 �` � TG-321 ON BOTH ACCE SIBLE ROM OUTSIDE `� '
<br /> 3 1 oF a a c �r A � �, - BAIANCING DAMPER ��
<br /> SIDES OF WALL, M589
<br /> \ �'P, � � SD-1 INSTALL SITE—TIGHT
<br /> -�-ti-
<br /> � CFM � \SD-1
<br /> SD � S�- � 3 210 C M SD-220 s�-22o
<br /> 21 �M 210 „ � 2730 CFM ,_ , 2730 CFM G E�J E R A� �l 0 T E S
<br /> , 210 CFM 210 FM 210 CFM 210 CFM INSTA�LED 210 GFM � O 26� 26� � � 0 A V U (S IE TY ), AN 0 RE
<br /> � � � TYP. 38 � 1�- L��,y OUTLINE OF � vo � PA T MI L/ X. IT M E Q , SI ;
<br /> 1
<br /> � � � � � � Sa-� � � � FLOORL BELOW C R S NE E ( RO L DC
<br /> ---- �� - \ S� � � 210 F - SQ-1 0 0 R . �
<br /> p-� ` � ` 1 S� _ 21 � 210 CFM �0 CF � 2 U ER LA ED BA D AMP R; IZ 16" ",
<br /> , � 2 210 CFM 210 �P� � � R KI MO L BD .
<br /> �
<br /> 210 FM � 210 CFM � P 0 TE AI SU . D U R - , TI S OD
<br /> � M ; 4- AY DJ T E, 4" 4" 0 LE 8"
<br /> D-1 SD-1 - �2�� I � CK E IR S A -T -R ND U A PT .
<br /> ,�,� � � �CFM 2 �CFM N
<br /> � m �21�0 C M � 0 4 GC TE ET N RI , U MO L OR
<br /> SD- SD- \ so-22o S�-2 2 o �p � W/ A A R C E, 4 4 OD E, Y N
<br /> � 210 � M 2 1 0 C F M 210 2 1 0 F M �-1 � 2 7 3 0 C F M 2730 CFM � IL G.
<br /> 210 CFM � .
<br /> ``' SD-1 SD-1 SD-1
<br /> O 24� O 26� � 5 U ER LA ED BA D AMP R; IZ 24"
<br /> w
<br /> ,�, SD-1 210 C�M SD-1 SD-1 1 FM SD-1 Sp_� 210 CFM Sd_� � �, 2E1 , G SK M E CB ; U D LL BO /
<br /> v� 210 F 210 F FM � �FM 21 CF 21� CFM � � � �
<br /> �
<br /> , � \ , 0 6 � COOLING UNIT, FAN COIL, CAPACITY - 11500 BTUH,
<br /> Q _ � s� c AIR FLOW - 520 CFM, CHILLEQ WATER FLOW - 3.5
<br /> - � GPM AT EWT = 45°F, 4-ROW COOLING COIL, BOTI-OM
<br /> `- � � z �� RETURN, 115 VOLT SINGLE PHASE 3 TAP PSC
<br /> �, 1��� � � MOTOR, 24 VOLT CONTROLS CODE BCO2, CODE 24
<br /> � � PIPING PACKAGE, 2-WAY 2-POSITION VALVE,
<br /> �- I I � i � ENVIRO-TEC MODEL/SIZE H�P 30 �
<br /> w � w
<br /> z A - z
<br /> J _1
<br /> _ _
<br /> `� 34� DOWN & TRANSITION ¢ R E F E R E N C E D RAW I �l G S
<br /> � TO 30/30 FLANGED CONNECTION �2� �
<br /> AT F�QOR FOR CONTINUATION
<br /> SEE PARTIAL PLAN ON SHEET M584 j
<br /> 34� 34� 34�b � �
<br /> �
<br /> SR-249 �`�F� '
<br /> 500 CFM 11E5
<br /> SR-249 SR-249 �6 �� SR-249 16/7 �
<br /> 500 CFM AC-121 500 CFM 500 CFM
<br /> SUPPLY AIR
<br /> � 0 0 , E��vA-ro� 2
<br /> 14F5
<br /> I 1
<br /> I hACTQRY FLOOR SPACE
<br /> � 11F5
<br /> Bo�a F�oaR A
<br /> COf� STRUCTON �1QTES
<br /> _ _ - - x x - _ Q q� _ � � 1�j' REMOVE ALL DUCTWORK, DAMPERS, GRILLES,
<br /> �1�� QUIP, RM. - DIFFUSERS, AND T-STATS SHOWN HATCHED.
<br /> 13F5 CFM
<br /> SR 246 SR 246 SR 246 � o ����
<br /> �
<br /> _ _ A72� — — �Z2 CE1�L — — 9Z — — — - �
<br /> -- -- -- -- -- -- — — -- -- — -- -- �— --�---- �—
<br /> MATCH LINE - FOR CONTINUATION SEE SHEET 1 M10-36
<br /> PARTIA� P �Af� � EW
<br /> SCALE: 1/8"=1 '-Q" �
<br /> DD CC C G L Q S.
<br /> � 05 06 07 08 09 ��'
<br /> io
<br /> � 10 11 12 13 14
<br /> 9
<br /> � 15 16 17 18 19
<br /> � 8
<br /> N 20 21 22 23 24
<br /> 7 '
<br /> 25 26 27 28 29
<br /> s
<br /> 30 31 32 33 34
<br /> 5
<br /> 35 36 37 38 39
<br /> 4
<br /> 40 41 42 43 44
<br /> ,� ,� 3
<br /> 45 46 47 48 49
<br /> 2
<br /> 50 51 52 53 54
<br /> G R � U P �
<br /> 55 .
<br /> 600 Stewart St., Ste 1400
<br /> Seattle, W�shington 98101 K EYP �AN
<br /> PHASE 1 I FC -r@� 206.267.�70o SCALE: NONE �
<br /> �9.30. 16 Fax 206.267.1701
<br /> SAZAN # 500-1666 8 4� 0 4� 8� 16�
<br /> SCALE: 1/8"=1 '—0" M
<br /> �
<br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTIT�E CURRENT REVISION SYMBOL DATE Q
<br /> ACCEPTABILITY N
<br /> - 767 TUBS & FRAMES 96206518 GMH 04.21.97 THIS DESIGN AND/OR CHECKED HVAC DUCTW�RK PLAN - FIRST FLOOR W2572915 09.30.16 � .
<br /> SPECIFICATION IS APPROVED SHEEt" ,�
<br /> = CEILINGS 1 96206524 �sM 09.11.97 � - ENc�NEER TITLE IRC - WBS 2.2.3.4.2 ADDITIVE MANUFACTURING � M 10 R�� 1
<br /> APPROVED BY DEPT. DATE �
<br /> IRC OFFICES 52378101 MJP DH/FB 01.31.06 APPROVE�D �U I L D I N G 40-056 0
<br /> - ELEVATOR MDERNIZATION 53411805 GBK DH/FB 06.30.06 JOB N0. COMP N0. �
<br /> �
<br /> �
<br /> A IRC - WBS 2.2.3.4.2 ADDITIVE MANUFACTURING W2572915 SAZAN/GB 09.30.16 APPROVED MECHANICAL MASTER COL. G-G/5-6 EVERETf, �11�A owc No. 40-056-1 M10R-31
<br /> nn n�a ti�a�n ntnir
<br />
|