Laserfiche WebLink
� e} 5 v r:: y e -'sv\•`' . .� v c# .� � y n ? � r � z. i v :`'. S� �� �t �1 9�4Y� � a�vv�i��l, .z a s Fxivai <br /> > 2�? <br /> .�y�2 t.-•E'xSt�l3 ik4 :^ tS3 690a 0`�3 NLt\�vE"v\CZ Tz.E •c ] L..,. SANMx RR <br /> 'aS?. yZY P \ <br /> l <br /> 8 m" -n a a b. i wx pyz ,ve a w\m \ "v " <br /> «swtoo e mzovY: ass _ , v ` w agedxi , tRi1 . Zmvt <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to(a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br /> required, select the box next to(b)and(c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> *If item(a)-(ii,iii,or v)is selected,the work must also comply with section(a)-(vii).See arrow flow chart below. <br /> (3) Electrical plan review. <br /> O (a) Electrical plan review is not required for: <br /> O (i) Low voltage systems; <br /> e--❑ (ii) Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> ❑ (iii) Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution system <br /> ❑ does not include: <br /> (A)Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2;or <br /> (C)A required fire pump system. <br /> 4 0 (v) Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B)Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> • (C)Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (D)Service or feeder load calculations are increased by 5%or less. <br /> (vi) Electric power production source(s)such as solar photovoltaic,fuel cell,or wind electric system(s)with a total <br /> ❑ rating of 9600 watts or less. <br /> (vii)For installations in(a)(ii),(iii),and(v)of this subsection to be considered,the following must be available <br /> -*❑ to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed; and <br /> (D)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan review is not required for"Medical,dental,and chiropractic clinic"of which is a clinic or <br /> ❑ physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> ® (b) Electrical plan review is required for all other new or altered electrical projects in educational, institutional, or health care <br /> occupancies defined in this..chapter. <br /> O (c) If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> TAieoci 0:61:0 g00-g <br /> ti tk'p`r Pe dn4•Cai a:p.palhties g f onat•a 14e10 bonaE caFetiitte Pb esof 4sise i'.t ty,or�tftti i•P'. Fhi es. <br /> •kfea orPorsisse iCare uhety.- Ptan.ReuieW ,cydg a#ijs3 #rI[s tgfiXtx[#4r RS t ttae e9Y:: <br /> I£aqoC [thertabiit 04: ' Re4 04 <br /> hospital Yes <br /> t j thOR ii htti.PFP Plri4 yes at�tz3 al YRS <br /> c*fe'unit st t rtal <br /> tear:Deg home :iter <br /> A e{ aveng fdat ' NAS: <br /> #tiva alctahoTsre hesgiief Yes rytct$ �La 7 s (f£t 3)Ict.=.'�iQ Va <br /> F?aiUa[ed gktiia it t4usp4 Yea3..A ctt •ate# .'14kt•tto 01- tttth&•at 5p ttitatfs <br /> 'iuetern[iy home' Yes txAt3'2 €4:0. i iceti eW ran fadf types riot <br /> x -:re eu4 d byt i, epariment. <br /> 4ax6Gla.aryscsrge# €auiir Yep • <br /> RenalIZ'emadiaWjs'Fs.eiinic .yes <br /> 4414e1SitiAti. aF steffaciitty+ YA”0 <br /> enhanced service fe aty Yes• <br /> a duftsesrct tlal;r bebilitatYiait Yes PERMIT* �J Page 2-Plan Review <br /> ce;�ti=r <br />