Laserfiche WebLink
INSPECTION REPORT <br /> _ -� Date ioilligPermit: _ -`ip�p <br /> Contractor: in—� 1 <br /> e "� S1CVGs• <br /> -2- C C (G Owner: _n U_ _ "�'- <br /> Site Address: /815 &kt*yxu Nre-r 1)e- <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> Ei Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final II❑Gas PipePihFinal ❑HWT Final <br /> OT ER OR CONSULTATION: ' �mo�v-_i.Jv�'_____. <br /> APPROVAL ❑ PARTIAL APPROVAL <br /> ❑ FOR T.C.O. 7❑ CORRECTION REQUESTED FINAL APPROVAL THIS PERMIT <br /> � , <br /> ❑ OK FOR C.O. ❑ VIOLATION • <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: Date: 1 S C C <br /> EIR(10/06) DATABAR,INC <br />