Laserfiche WebLink
r. INSPECTION REPORT <br /> Date 6//1 1/LS Permit: E) 0(011 n <br /> Tir <br /> , An <br /> _ Contractor: M M Com-Fork <br /> �3 ���� Owner: <br /> Z McCD1rm i 6:. / 1ain& <br /> Site Address: '4-( n -C: kVi tAi_bo j <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> El Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> aftle_qrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK LI Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final LI HWT Final <br /> ����////O,,,,THER OR CONSULTATION: <br /> PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> O FOR T.C.O. ❑ CORRECTION REQUESTED <br /> [j] OK FOR C.O. ❑ VIOLATION � <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 1r------ <br /> ole. // 1 , <br /> •Inspector: 01)ei Date: +� — AO • <br /> EIR(10/06) DATABAR,INC. <br />