Laserfiche WebLink
2/25/2019 <br /> City of Everett Page 1 f <br /> 3:26:23PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1802-017 Site Address 2517 E GRAND AVE <br /> Applied 2/21/2018 Applicant GREEN BUILT NORTHWEST LLC Lot <br /> Approved 4/2/2018 Owner QUIROGA JORGE FABIAN Block <br /> Issued 4/2/2018 Contractor GREEN BUILT NORTHWEST LLC Tract <br /> Parent Permit No. W1704-001 Description CONVERT DUPLEX TO A SINGLE FAMILY <br /> Notes (8/22/2018 7:08 AM TKJ) <br /> ADDED 2 BATH FANS AND LAUNDRY FAN TO SCOPE OF WORK <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 4/6/2018 4/6/2018 BLDG TMB CORRECTION See notes South wall is completely being replaced. <br /> 01-CONSULTATIO 2nd floor--->to foundation. <br /> West 2nd floor not open,may need <br /> replacing? <br /> 5/8/2018 5/9/2018 BLDG DWF OTHER Consult-OK to 5/8/2018 12:21 PM Stephanie Quiroga <br /> 08-FRAMING proceed <br /> Contact Name:Stephanie Quiroga <br /> Site Address:2517 E GRAND AVE <br /> Phone:2062749226 <br /> e-Mail:stephanie@greenbuiltnw.com <br /> 5/9/2018 5/9/2018 BLDG DWF APPROVAL OK to cover 5/8/2018 12:32 PM Stephanie Quiroga <br /> 07-EXTERIOR If possible,could we get a phone call with <br /> an ETA prior to inspection?Otherwise <br /> please call for lock box code. <br /> Contact Name:Stephanie Quiroga <br /> Site Address:2517 E GRAND AVE <br /> Phone:2062749226 <br /> e-Mail:stephanie@greenbuiltnw.com <br /> 5/31/2018 5/31/2018 ADMIN OTHER TAH OTHER REFUNDED (5/31/2018 9:01 AM TAH) <br /> PLUMBING FEES REFUNDED 80%OF PLUMBING FEES <br /> 8/22/2018 8/22/2018 BLDG DWF CORRECTION Need mechanical rough in sign off before <br /> 08-FRAMING bldg framing inspection. <br /> Note:Framing support(mid-span)floor <br /> joist 2nd floor(sagging?).Need <br /> architect/engineering desgin for correction. <br /> Safety glass in stairway<60"from tread. <br /> 8/27/2018 8/27/2018 MECH 04-ROUGH SDP CORRECTION No access <br /> IN <br /> 9/11/2018 9/11/2018 BLDG TMB CORRECTION 1.Complete the ventilation fans and obtain <br /> 08-FRAMING inspection. <br /> 2.Address site drainage and roof drainage <br /> as discussed. <br /> 3.Complete air seal at platelines. <br /> 4.Complete corrections and recall <br /> inspections. <br /> 9/11/2018 9/11/2018 BLDG TMB CORRECTION 1.Complete the ventilation fans and obtain <br /> 08-FRAMING inspection <br /> 9/11/2018 9/11/2018 MECH 04-ROUGH SDP CORRECTION No access 9:20am <br /> IN <br /> 9/13/2018 9/13/2018 MECH 04-ROUGH SDP PARTIAL APPR 1.Complete the bath fan for the upstairs <br /> IN bathroom.Please have a ladder at the attic <br /> entrance so the inspector can inspect. <br /> 9/13/2018 9/13/2018 BLDG DWF CORRECTION Need mechanical rough in. <br /> 08-FRAMING 9:41 am sign off. <br /> 9/14/2018 9/14/2018 BLDG TMB APPROVAL OK to insulate <br /> 08-FRAMING <br /> 9/14/2018 9/14/2018 MECH 04-ROUGH TMB APPROVAL Fan ducting and <br /> IN dryer duct <br /> 9/19/2018 9/19/2018 BLDG DXW APPROVAL Insulation OK to cover(drywall). <br /> 11-INSULATION <br /> Note:Need to post temp site address to <br /> continue inspections as per R319.1 <br /> INSP12 CR Y TEM <br />