My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7100 HARDESON RD 2019-03-22
>
Address Records
>
HARDESON RD
>
7100
>
7100 HARDESON RD 2019-03-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 12:28:00 PM
Creation date
3/22/2019 12:27:51 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7100
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 P.PA'1 .-9 ,./ 1O7—& <br /> t CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS <br /> Report Number: M7171659.0002 <br /> Service Date: 09/01/17 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 09/12/17 Revision I -specat 7 days-not`28 Lynnwood, WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> KPFF Consulting Engineers MCOB Hoist Installation <br /> Attn: Jeffrey Lehman 7000 Hardeson Road <br /> 1601 Fifth Avenue Everett, WA <br /> Seattle, WA 98101 <br /> Project No.: M7171659 <br /> Permit No.: B1701-003 Weather: Sunny <br /> Samples: (4) 4x8" cylinders <br /> Continued reinforcement inspection for pit slab-on-grade between grid lines H to J/1 to 4. The previously listed <br /> items from service date 08/30/17 were found to be complete and conforming. <br /> Observed the placement of(10.5) cubic yards of Cadman mix#1344550 into pit slab-on-grade noted above <br /> between grid lines H to J/2 to 4. The concrete was placed via pump and mechanically consolidated. Cast (4) <br /> 4x8" cylinders for compressive strength testing (4000 psi requiredrat 7 days). <br /> CORRECTIVE ACTION TAKEN <br /> The previously listed items from service date 08/30/17 were found to be com�___plete and conferring------ <br /> o the best of our knowledgthe items inspected today are in conformance with approved plans and <br /> specifications.---\—_ ---- p • . __________ - <br /> j/ <br /> Services: Special Inspections/Materials Testing <br /> Mayes Testing Engineers Rep.: Andrew Bontrager <br /> Reported to: KPFF <br /> Contractor: KPFF <br /> Report Distribution: <br /> (1)KPFF Consulting Engineers, (1)City of Everett,Permit Services <br /> Jeffrey Lehman 't f <br /> (1)Community Transit,Larry (1)KPFF Consulting Engineers,Rob Reviewed By: ,,0�P..;. a - - <br /> Daubenmire Price a- <br /> (1)Mayes Testing Engineers,Inc,Bob Robert Gardner <br /> Gardner <br /> Senior Project Field Manager <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client <br /> indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br /> the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. 1¢"" <br /> CT0001,10-16-13,Rev.10 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.