Laserfiche WebLink
'Lot. INSPECTION REPORT <br /> �' _ Date bp �j <br /> Permit: '6 1101-i ""u L6^ft <br /> Contractor: \G Cg <br /> Owner: <br /> Site Address: 3?J A �-V <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ening Grid ❑Drywall Nailing ❑Plumbing Final <br /> ectrical Final ❑Shear Nailing GAS PIPE <br /> SITE ORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑NWT Final <br /> OTHER OR CONSULTATION: 2 O Q "519 �-_EM Q2 <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> FOR T.C.O. ❑ CORRECTION REQUESTED El <br /> • OK OR C.O. ❑ VIOLATION ___ <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTI' can meet at site. <br /> Final ror stall'203. <br /> Call ahead so we <br /> inspection anytime we leave site at 2pm <br /> .eitti/e„...r,j <br /> r. <br /> 0.,,,...0 <br /> 0 t& t frI r-c.,, ,,,,,,c <br /> f4 1Or) 3 o203 <br /> Inspector: /� Date: .40 <br /> i <br /> EIR(10/06) DATABAR,INC. <br />