Laserfiche WebLink
7 INSPECTION REPORT <br /> Date llz (& Permit: k 2 q,s® L <br /> Contractor: <br /> Owner: <br /> Site Address:_� VS \—teVeLk�©� <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> • 'ough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> I•i Service ❑Framing ❑Rooftop Units ❑Water Service <br /> • rounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> • -iling Grid ❑Drywall Nailing ❑Plumbing Final <br /> !!Electrical Final ❑Shear Nailing GAS PIPE <br /> WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER — <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 0 S �� s, <br /> TiNick--z_____ _ <br /> ,ZeiO4-- <br /> Inspector: Date: C4 C$ <br /> EIR(10/06) - DATABAR,INC. <br />