My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6603 HIGHLAND DR 2019-03-27
>
Address Records
>
HIGHLAND DR
>
6603
>
6603 HIGHLAND DR 2019-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2019 8:25:19 AM
Creation date
3/27/2019 8:25:10 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND DR
Street Number
6603
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC mORKS PERMIT Date: 7/22/2016 <br /> 2 City of Everett Public Works Department <br /> Public Works Permit#: PW1607-039 <br /> 4 ,, . . 3200 Cedar Street Parent Permit#: C1606-018 <br /> tux; giTT <br /> _ Everett, WA 98201 Planning Reference#: SS14-008 <br /> (425)257-8810 <br /> Public Works Fee$: $ 65.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> S't C.VS-rOsM CO S-C BUSTARD CUSTOM CONST INC <br /> 6601 HIGHLAND DR PO BOX 1243 <br /> EVERETT WA 98203 MARYSVILLE WA 98270 <br /> PHONE: PHONE: 4258766551 <br /> TAX PARCEL ID# 00531700302000 SITE ADDRESS: 6603 HIGHLAND DR <br /> SITE WORK FOR NEW SFR(LOT 4) <br /> NORTH BEVERLY PARK DIV 2 BLK <br /> 003 D-00- LOT 20 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> Fi <br /> 4. Site Civil Work to be done per plans approved by the Ci of Everett Publ'c.Wo k _ 2'•47,3 '.ti <br /> Department dated 7/22/2016. • I-_ __ ,,,_, �___,_. �� �_ , .,�. ,_ ,-� "4 <br /> 5. Contact the City of Everett Public Works Inspector n� :At . ,9.;F ; is .,,-; = ••=.:',...',4 F- W <br /> to starting construction and with other inspection requ S s. r-y=, '�5:x•.9:.i L.;`' - -`-.'' r=i -° ["I <br /> 6. Install erosion control measures per City of Everettttanc ds IPtir small parcels ar 0-y <br /> COD <br /> remove upon completion of the project prior to final appro l of the permit. I-"` =' o <br /> 7. KeepCitystreets clean at all times. No dirt, mud, rocks`,°ior debris to be tracked or>fd r_� `. .:-.1; P <br /> roadway. -4r_; o <br /> 8. Protect all existing underground utilities and stormwatl,,facilities during construction. r` <br /> 9. Amended soils must be installed per plans and draif ce.eport for short plat •.:, =-i <br /> SS14-008. p,l F°`p' I '� �., rY7 "� <br /> ,_Y•. •J:S G t. .1.4.i c..-. •a-,,.._.•ry}.rpt I...-,.I-, „r•.•eit•ti"<t.t.r. .. <br /> •...L{`w,6_.•...! •w:,--.3 C><#)CT7.g..:'1--n f•..7 c: r•. , •a r.,�r•.,�r'•.a <br /> I-- :�a•tii ...-0'.--,E)..G•-P-3 >. 1.-- ,.—"s r•.-�.'••,rw>,;— r_:7 O <br /> Public Works Permit Fee Breakdown: � 1 e.v).-- .--` ="•-cm '`_'`"'_p''° " =' `�' ='��' F _ <br /> ._y w>a rs .,._> ....>r•y ,_a ._::a ...._>CC)��>rr1 r_Y3 4•�> >v^'.•> <br /> Driveway $25.00 tCr':fart <br /> _s x_p <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> AO <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> /� City of Everett from any and all claims for damages,costs,expenses,or <br /> .jailita- <br /> 7•--Z2-'/6 causes of action that may arise because of installation and maintenance of the <br /> Approved for Construction Date improvement or other right-of-way use hereto applied for and further agrees to <br /> pp remove same upon notice from the City and to replace public property <br /> damaged flyby. <br /> FINAL INSPECTION • Date ^16 <br /> Approved as Constructed Sig tore of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> FYIE <br />
The URL can be used to link to this page
Your browser does not support the video tag.