Laserfiche WebLink
INSPECTION REPORT <br /> Date��2he)__ Permit: �WD__2—Z) (0 <br /> - Contractor: <br /> Owner: 5iVicti4C <br /> Site Address: 04' ' 1(O _ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final G�J�❑GasrPipe�Final <br /> �y�D ❑^/HH/WTDFinal <br /> OTHER OR CONSULTATION: �L9 ` rni 3�I L cool ). <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> K FOR C.O. ❑ VIOLATION <br /> NABLE TO PERFORM INSPECTION: <br /> nn CALL(442 n <br /> 25)257-8881 FOR REINSPECTION—24 hour notice required <br /> `_ 3 1 <br /> D A C.C e.5 <br /> Inspector: / Date: (3 [ a. <br /> EIR(10/06) DATABAR,INC. <br />