My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1216 HOYT AVE 2019-03-27
>
Address Records
>
HOYT AVE
>
1216
>
1216 HOYT AVE 2019-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2019 1:44:18 PM
Creation date
3/27/2019 1:44:18 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1216
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS' <br /> MISWil '111•11'4V <br /> February 6, 2019 <br /> DANIEL M NEWMAN <br /> 108 2ND AVE S NO 111 <br /> KIRKLAND, WA 98033 <br /> RE: STATUS OF YOUR CITY OF EVERETT PERMIT(S) <br /> EXPIRED PERMIT NO.: B1808-023 <br /> SITE ADDRESS: 1216 HOYT AVE <br /> DESCRIPTION OF WORK: REROOF EXTG SFR <br /> EXPIRATION DATE: 3/6/2019 <br /> This permit will expire soon. After 3/6/2019 work will no longer be authorized. <br /> Sections 105.5 and R105.5 of the International Building Code and International Residential Code state <br /> that permits become invalid if the work is not commenced or is suspended or abandoned for more than <br /> 180 days. <br /> 1. If work is complete, request a final inspection to close out the permit. <br /> 2. If work is continuing, request an inspection. <br /> 3. If work is currently suspended but will be pursued to completion within the next 6 months, <br /> request a permit extension through the Online Permitting Portal at pw.everettwa.gov. The <br /> reason for the extension is required. <br /> Please request inspections through the Online Permitting Portal at pw.everettwa.gov. Inspection <br /> requests submitted online by 11:59pm Monday-Friday will be tentatively scheduled for the next <br /> business day. If the volume of requests exceeds what can be completed the next business day, the <br /> remaining requests will be given priority on the schedule for the following business day. <br /> If no action is taken within 14 days of the mailing date of this letter, the permit record will be closed <br /> without an approved final inspection. <br /> Continuing work after the permit is closed will require a new permit application and fees to inspect the <br /> work not finaled under the original permit. <br /> If you have questions or would like to discuss the status of the permit, contact our Permit Technicians <br /> at 425.257.8810. <br /> 2/6/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.