Laserfiche WebLink
INSPECTION REPORT <br /> / ,.' Date II /5 /0 Permit: ('1 L D CO —0 2-__Z_ <br /> • <br /> Contractor: QWf)(— <br /> Owner: �, `C-Q,,\k, S v40,.Cd <br /> Site Address: i /i t -Q-Q, <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑`Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation LI Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final Shear Nailing GAS PIPE <br /> SITE WORK Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains eiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> X,..1APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> al` b r v0 <br /> Inspector: A Date: , i / <br /> EIR(10/06) DATA:AR,INC. <br />