Laserfiche WebLink
RY -ONULTING <br /> 5628 Airport Way South Suite 112,Seattle,WA 98108 <br /> 6/8/18 <br /> City of Everett Permit Services <br /> 3200 Cedar St <br /> Everett,WA 98201 <br /> 425-257-8810 <br /> VIA FedEx <br /> RE: Request for Minor Modification to Existing.Wireless Facility-Section 6409/47 CFR§1.40001("6409") <br /> Site Address: 2020 Lake Heights Drive <br /> Prior Case No.: Permit It: B1605-051 <br /> AT&T Project No.: WA6981 Silver Lake Relo—LTE 3C/4C/4TXRX <br /> To Whom it May Concern: <br /> On behalf of New Cingular Wireless PCS, LLC ("AT&T") we are pleased to submit this request to modify AT&T's existing <br /> wireless communication site at the location referenced above, as an Eligible Facilities Request for a minor modification <br /> under Section 6409. A copy of the Federal Communication Commission's new 6409 rule is enclosed for your information. <br /> Scope of Work <br /> AT&T proposes the following minor modifications to this site: Replace (3) existing antennas and add (6)TMA units on an <br /> existing pole. (No increase in height proposed). (Please note: all work will be performed wholly within the existing <br /> premises and utility easements;this site is free of any concealment features;and the project otherwise complies with the <br /> site's original conditions of approval.) <br /> Component Federal Section 6409 AT&T's Proposed Modification <br /> Limits <br /> Increase height of tower 20 feet or less No increase in height <br /> Antennas extending 20 feet or less No increase in projection from <br /> horizontally from edge of edge of tower. <br /> tower <br /> Additional equipment 4 or fewer No additional equipment cabinets <br /> cabinets <br /> FCC Shot Clock for Section 6409 Minor Modifications <br /> Our goal is to work with you to obtain approval of this minor modification earlier than the deadline. We will respond <br /> promptly to any requests for information you may have for our application. Please let us know how we can work with you <br /> to expedite the approval process. We look forward to working with you on this important project,which will significantly <br /> improve wireless telecommunication services in your community without requiring an additional site. Should you have <br /> any questions or require additional information, please do not hesitate to contact me. <br /> Sincer- y? <br /> Christine Contreras <br /> Ryka Consulting on behalf of AT&T <br /> Enclosures: FCC Rule for Section 6409 Applications(47 CFR§1.40001) <br />