My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2235 LAKE HEIGHTS DR 2019-03-28
>
Address Records
>
LAKE HEIGHTS DR
>
2235
>
2235 LAKE HEIGHTS DR 2019-03-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 7:50:05 AM
Creation date
3/28/2019 7:50:04 AM
Metadata
Fields
Template:
Address Document
Street Name
LAKE HEIGHTS DR
Street Number
2235
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of <br /> Project Comment Form Ili?t2 l th <br /> August 27,2018 <br /> Construction Review Services <br /> Project Information: Po Box 47852 <br /> 111 Israel Rd.SE. <br /> CRS# 60875836 Tumwater,WA.98501 <br /> Bethany at Silver Lake www.doh.wa.gov/crs <br /> Chapter 388-97 WAC Nursing Home tel.360-236-2944 <br /> fax.360-236-2321 <br /> Project Title: Generator Replacement <br /> Project 2235 Lake Heights Dr Electronic Submittal. Plans will be delivered to: <br /> Location: Everett,WA. 98208 Name: Brandon Matrone <br /> Email: brandonm@bethanynw.org <br /> Local Permit#: Phone#: 425-338-3000 <br /> Key Contacts: Company Name Phone Email <br /> DOH Reviewer KevinA Scarlett RA HFDP (360)236-2949 kevin.scarlett@doh.wa.gov <br /> Facility Contact: Bethany of The Northwest Mitch Garcia 425-338-3000 mitchelg@bethanynw.org <br /> Facility Admin.: <br /> Arch./Eng.: <br /> Other: <br /> Other: <br /> Other: <br /> Other: <br /> Local ART: City of Everett Tony Lee (425)257-8812 TLee@everettwa.gov <br /> Addt'l Copies To: ❑ L&I Electrical Section ❑ L&I Factory Assembled Structures ® Local Electrical AHJ <br /> Project Status: <br /> -Not Approved- <br /> This project is not approved for use or licensure. Construction is not authorized to begin. See page two for <br /> important next steps. <br /> A2BC <br /> Preliminary Initial Issued All Approved <br /> Conference Plan ReviewConstruction Comments Closeout Inspection to Use <br /> Completed Completed Begins Approved Completed Required Space <br /> N/A Yes No No No <br /> 11 Yes • ; No • <br /> Construction review process I • <br /> Page 1 of 6 Plan Review Comments for Project 60875836 <br />
The URL can be used to link to this page
Your browser does not support the video tag.