Laserfiche WebLink
2/8/2019 City of Everett Page__.., 2, <br /> 9:58:19AM <br /> INSPECTION ACTIVITY REPORT <br /> 1/30/2019 1/30/2019 PLUMB 06-FINAL SDP APPROVAL eTRAKiT Inspection 1/29/2019 10:55 AM Edgar Munoz <br /> Request Please,if it is possible,perform inspection <br /> in the morning. <br /> Thanks! <br /> Contact Name:Edgar Munoz <br /> Site Address: 1216 LOMBARD AVE <br /> Phone:4252996990 <br /> e-Mail:edgar.munoz@yahoo.com <br /> 1/31/2019 1/31/2019 BLDG 14-FINAL DWF APPROVAL as noted AM inspection please <br /> 425-344-2264 <br /> (1/31/2019 10:54 AM DWF) <br /> Contractor to install hand-railing all the <br /> way to bottom step. <br /> Returns at top/bottom of hand-railing,as <br /> per IRC. <br /> 1/31/2019 1/31/2019 ADMIN USE AKH APPROVAL <br /> ONLY** <br /> INSP12CRWS YS TEM S <br />