Laserfiche WebLink
• <br /> IMPORTANT - IMPORTANT <br /> Frost Rail Pipiing Instructions <br /> Step#1 <br /> Use These Fittings When <br /> Daisey Chaining the Rail <br /> Refergeration Circuit. <br /> Section#1/Frost Rail Section#21 Frost Rail <br /> L Follow Refrigeration <br /> Circuit Drawings <br /> Approx.4.0"Long Approx.7.0"Long <br /> Drain Approx.4.0"Long <br /> Drain <br /> Each Section has its own Each Section has its own <br /> drain. 3/8"Long 3/8"Long Street drain. <br /> Sweat Elbow `..r , Elbow <br /> Please Note! <br /> Do Not Pull Down <br /> on Copper Lines I <br /> Please Notel <br /> Insulate Copper Loops with <br /> 314"thich insulation. <br /> Material List Required for Frost Rail <br /> ( Fittings) <br /> Note!518"Suction Line required. <br /> 1/2 Liquid line required. <br /> • <br /> Multiply Total 1 <br /> -318"long sweat elbows--- <br /> Rai!Sections ti!'•.318"long sweat elbows <br /> 3/8"long street elbows I'•318"long street elbows <br /> :.318"x 112'sweat coupling <br /> •318'x 518"sweat reducer <br /> Factory Supplied TXV. <br />