Laserfiche WebLink
• <br /> / C 1 <br /> HIL__ ( TE 800.chILL:RITE MFG. hEATI \G ELEV =\T AND <br /> 800.256.2190 CONTROL DOX INSTALLATION <br /> 0 985.641 .0183 — FAX D AWI \C-5 <br /> J <br /> TOP CAP - Silicon Between SI I <br /> coNi <br /> HEATING CABLE--.-C-1 Butt End of I,iI! <br /> THIS IS WHERE 1 <br /> THE SCREW HEATING CHANNEL-) 1 *, <br /> AND c-------,------- <br /> SPEED NUT O® I / �� / /I' 0 <br /> CONNECTS 1- -1/VALL'INSUL/TION / j <br /> FROST RAIL / // / / A / I O- ---<� ,�-- <br /> SECTIONS / /___I / , /. / �/� / LZ <br /> ( )' hEATING CABLE----,-z( % <br /> PLEASE NOTE: THERE ARE 4 HEATER CABLES THAT NEED TO BE <br /> INSTALLED IN EVERY RAIL SYSTEM I <br /> TOP CAPS <br /> 1 <br /> HEATING <br /> TE=RMINATING END + CABLE <br /> - J -T-STAT SENSOR <br /> - L =- = <br /> NOTE. ENDweR <br /> a�Di, <br /> THE FOUR HEATER CABLES RUN PARALLEL IN BOTH THE TOP AND BOTTOM OF EACH RAIL WALL. PLUG • <br /> THERE ARE HOLES PROVIDED ON THE BUTT ENDS OF EACH RAIL SECTION SO THAT THE CABLE <br /> 11 <br /> CAN PASS THROUGH FROM SECTION TO SECTION. ONE END OF THE FINISHED RAIL MUST BE <br /> THE STARTING END OF THE CABLE - THIS WILL BE THE TERMINATING END OF THE HEATER CABLE. <br /> THE OTHER END OF THE CABLE 15 KNOWN AS THE POWER END WHICH WILL RUN TO THE 4'MAX FROM If ND OF CONTROL <br /> OPPOSITE END OF THE FINISHED RAIL. THIS POWER END WILL TURN DOWN THROUGH THE BAR RAILTO LOCATION <br /> OF CON7ROLBOX <br /> TOP TO THE HEATER CONTROL BOX. WHEN THE TWO POWER ENDS FOR EACH SIDE COME OUT r BOX <br /> OF THE BOTTOM OF THE LAST SECTION, THEY NEED TO BE CONNECTED IN PARALLEL TO A POWER <br /> CORD WHICH WILL BE PLUGGED INTO THE CONTROL BOX. PLEASE NOTE THAT THE POWER END 1 _ <br /> OF THE HEATER CABLE IS THE PIG TAIL ENDS OF THE CABLE, DO NOT WIRE IN SERIES! <br /> 115v °0 <br /> CALL WITH QUESTIONS: 800-256-2 190 OUTLET oo ;� l3 <br />