My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1815 13TH ST 2019-03-28
>
Address Records
>
13TH ST
>
1815
>
1815 13TH ST 2019-03-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 10:50:18 AM
Creation date
3/28/2019 10:50:17 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lit 2L U � <br /> PUBLIC WORKS DEPARTMENT .� <br /> 04Utilities Division,3200 Cedar Street L.-)) U L f <br /> Everett WA 98201 SEP 2 9 2009 <br /> 425-257-8800 <br /> COST ESTIMATE SHEET <br /> �} CITY OF EVERETT <br /> Receipt # ( qq0 l riisi g/Public Services otio <br /> X Cost of Work Order $2313.70 Work Order# <br /> Cost of Service Order Service Order# <br /> Contact Person Joseph W. Taflin Telephone# 206-215-8256 <br /> Requested By Shane Cavanah 7d-/3 Date of Request 09/22/09 <br /> Property Owner(name) Providence Everett Medical Center M-Z ad9 <br /> Charge Cost to(name if different than owner) M.A. Mortenson co. <br /> Address 14719 NE 29th PL City Bellevue, WA Zip 98007 <br /> Installation Location 1811 13th Street <br /> Installation type/description/size/etc. Remove and reinstall hydrant, valve and temporary service. <br /> The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration, and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installa <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment renta. <br /> administrative costs, the deficit shall be charged to the property for which such installation was made ana me <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> cc: Bldg.Permit Center <br /> Material 368.71 Mark Sadler <br /> Kirk Brooks <br /> Labor and Benefits 1393.20 Gordon Witcher <br /> Equipment Rental 512.00 Matt Welborn <br /> Benyam Stephanos <br /> Tax 39.79 OCT 1 6 2009 Mike Ward <br /> Dennis Roberson <br /> TOTAL 2313.70 CITY'()FE17 <br /> Cliff Lindman <br /> Permit Sel-t,�R T T Randy Allen <br /> Prepared by: Mike Ward i�/ 4 V Date Estimate Prepared 09/25/09 <br /> Accepted by: Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\2009\1811 13TH Street.DOC 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.