Interwest Construction Inc. 3/6/2019 Change Order 1
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 3/6/2019 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 10:02:33 AM
Creation date
3/29/2019 10:02:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
3/6/2019
Department
Public Works
Department Project Manager
Rich Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001600
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc 12/27/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Watermain Replacement"T" <br /> Change Order No.1 <br /> Change Order Effective Date: February 22, 2019 <br /> CONTRACTOR <br /> By (t..l:L"t_CL,Cle Date: Z-/2 2 2 <br /> // <br /> Officer <br /> Exhibit A - Description of Changed Work <br /> This Change Order No. 1 adds one new item and modifies one existing bid item to the Contract in <br /> Schedule A as shown below. <br /> Added Item <br /> New Item #A-100—Sawcutting Cement Concrete Pavement, Final Joint Cut,Additional 1-Inch <br /> Thickness. Add new item#A-100 entitled, "Sawcutting Cement Concrete Pavement, Final Joint Cut, <br /> Additional 1-Inch Thickness" at the agreed to unit price of$0.78/LF, by adding 8,000 linear feet to the <br /> Contract, resulting in a$6,240.00 increase to the Contract price. <br /> Modified Bid Items <br /> Bid Item #A-5—Traffic Control Labor. Modify existing Bid Item#A-5 entitled, "Traffic Control <br /> Labor" at the Contract unit price of$57.00/hour, by adding 500 hours to the Contract, resulting in a <br /> $28,500.00 increase to the Contract price. <br /> JUSTIFICATION <br /> New Item #A-100—Sawcutting Cement Concrete Pavement, Final Joint Cut, Additional 1-Inch <br /> Thickness. The Contractor encountered cement concrete pavement greater than 6-inches thick in <br /> several areas of this project, but there is no corresponding bid item to pay for sawcutting concrete <br /> pavement thicker than 6-inches. This new item is being added to pay for costs to account for cement <br /> concrete pavement sawcutting over 6-inches thick. <br /> Bid Item#A-5—Traffic Control Labor. This bid item overran plan quantity and is being modified <br /> to account for costs for additional traffic control labor quantities. <br /> Total Cost of Change Order No. 3: $34,740.00 <br /> Contract Time: There is no adjustment to Contract time in Change Order No. 1. <br /> Page 3 of 3 <br />