My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2018 BLDG 40-37 Plans 2022-12-05
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-37
>
Plans
>
3003 W CASINO RD 2018 BLDG 40-37 Plans 2022-12-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2022 1:23:55 PM
Creation date
4/1/2019 11:42:55 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-37
Permit
B1807-041
Year
2018
Notes
ACCESS DEMO AND REPLACE WALLS MINOR RECONFIGURE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSUE LEGEND <br /> NOT YET ISSUED <br /> INCLUDED <br /> IN SET O PREVIOUSLY ISSUED, <br /> SHEET N0. SEQ. N0. DRAWING TITLE REV DATE NOT IN THIS ISSUE <br /> GENERAL • <br /> � GO GO COVER SHEET, CODE INFORMATION ORIG 07.02.18 <br /> s <br /> • G1 G1 INDEX OF DRAWINGS ORIG 07.02.18 <br /> • G2 G2 SYMBOLS, ABBREVIATIONS, GENERAL NOTES ORIG 07.02.18 ORIG ORIGINAL ISSUE <br /> FOR PERMIT, BID, <br /> • G3 G3 TECHNICAL SPECIFICATIONS ORIG 07.02.18 PROCUREMENT OR <br /> A R C H TE C TU R A � CONSTRUCTION <br /> 40-023—M1A29R A1 PARTIAL MEZZANINE REMOVAL PLAN ORIG 07.02.18 <br /> 40-030—M1A11 R A2 PARTIAL MEZZANINE REMOVAL PLAN ORIG 07.02.18 A DRAWING REVISION — <br /> 40-037-1 A15R A3 PARTIAL FIRST FLOOR REMOVAL PLAN ORIG 07.02.18 SEE SPECIFIC DRAWING <br /> FOR NATURE OF <br /> 40-023—M1A29 A4 PARTIAL MEZZANINE FLOOR PLAN A 07.02.18 REVISION <br /> • 40-030—M1A11 A5 PARTIAL MEZZANINE FLOOR PLAN C 07.02.18 <br /> 40-037-1 A15 A6 PARTIAL FIRST FLOOR PLAN E 07.02.18 <br /> 40-023—A399 A7 INTERIOR ELEVATIONS ORIG 07.02.18 <br /> • 40-030—A374 A8 INTERIOR ELEVATIONS ORIG 07.02.18 <br /> • 40-037—A376 A9 INTERIOR ELEVATIONS ORIG 07.02.18 <br /> 40-023—A467 A10 ENLARGED PLANS — MEZZANINE ORIG 07.02.18 <br /> 40-030—A451 A11 ENLARGED PLANS — MEZZANINE ORIG 07.02.18 <br /> 40-037—A505 Al2 ENLARGED PLANS — FIRST FLOOR ORIG 07.02.18 <br /> A501 A13 DETAILS ORIG 07.02.18 <br /> A502 A14 SECTIONS AND DETAILS ORIG 07.02.18 <br /> M ECH A �l CA� <br /> 40—SITE—MO MO RESTROOM LOCATION KEY PLANS ORIG 07.02.18 <br /> 40—SITE—M 1 A M 1 HVAC LEGEND ORIG 07.02.18 <br /> • 40—SITE—M1 B M2 PIPING LEGEND ORIG 07.02.18 <br /> O 40—SITE—M2 M3 MECHANICAL SPECIFICATIONS ORIG 07.02.18 <br /> i 40—SITE—M2-1 M4 MECHANICAL SCHEDULES & TYPICAL DETAILS ORIG 07.02.18 <br /> • 40-023—M1 M129R M5 PARTIAL MEZZANINE PLUMBING PLAN A 07.02.18 <br /> 40-030—M1 M111 R M6 PARTIAL MEZZANINE PLUMBING PLAN A 07.02.18 <br /> 40-037-1 M115R M7 PARTIAL FIRST FLOOR PLUMBING PLAN B 07.02.18 <br /> 40-023—M1M29 M8 PARTIAL MEZZANINE HVAC PLAN A 07.02.18 <br /> • 40-023—M1M129 M9 PARTIAL MEZZANINE PLUMBING PLAN A 07.02.18 <br /> 40-030—M1M11 M10 PARTIAL MEZZANINE HVAC PLAN � A 07.02.18 <br /> 40-030—M1M111 M11 PARTIAL MEZZANINE PLUMBING PLAN A 07.02.18 <br /> • 140-30-4501 —P-11 TOILET PLAN (REFERENCE ONLY) L 08.19.02 <br /> 40-037-1 M 15 M 12 PARTIAL FIRST FLOOR HVAC PLAN B 07.02.18 <br /> 40-037-1 M115 M13 PARTIAL FIRST FLOOR PLUMBING PLAN B 07.02.18 <br /> 40-037—OM115 PLUMBWG BASEMENT PLAN AREA 15 REFERENCE ONLY 03.94 <br /> ELECTR CAL <br /> • EOA E1 ELECTRICAL LEGEND 8c ABBREVIATIONS K 07.02.18 <br /> 40-023—M1 E29R E2 LIGHTING — REMOVAL A 07.02.18 <br /> 40-023—M1 E79R E3 208Y 120 VOLT POWER — REMOVAL A 07.02.18 <br /> 40-030—M1 E11 R E4 PARTIAL LIGHTING PLAN — REMOVAL B 07.02.18 <br /> 40-030—M1 E61 R E5 PARTIAL 208Y 120 VOLT POWER PLAN — REMOVAL ORIG 07.02.18 <br /> 40-037-1E15R E6 FIRST FLOOR LIGHTING PLAN — REMOVAL F 07.02.18 <br /> 40-037-1 E65R E7 PARTIAL 1 ST FLOOR 120 208V PWR PLN — REMOVAL E 07.02.18 <br /> 40-023—M1 E29 E8 LIGHTING A 07.02.18 <br /> 40-023—M 1 E79 E9 208Y 120 VOLT POWER A 07.02.18 <br /> 40-023—E500 E10 FLUSH VALVE AND FAUCET POWER DETAILS ORIG <br /> 40-030—M1E11 E11 PARTIAL LIGHTING PLAN B 07.02.18 <br /> 40-030—M1 E61 E12 PARTIAL 208Y 120V POWER PLAN ORIG 07.02.18 <br /> 40-030—E500 E13 FLUSH VALVE AND FAUCET POWER DETAILS ORIG <br /> 40-037-1 E15 E14 FIRST FLOOR LIGHTING PLAN F 07.02.18 <br /> E15 NOT USED <br /> • 40-037-1 E65 E16 PARTIAL 1 ST FLOOR 120 208V POWER PLAN E 07.02.18 <br /> 40-037—E500 E17 FLUSH VALVE AND FAUCET POWER DETAILS ORIG 07.02.18 <br /> W57�1115 <br /> buffalodeslgn PHASE 1 RENOVATION PACKAGE <br /> architecture � interiors IFC SUBMITTAL <br /> 1520fourfh ave p <br /> suite 400 07.02.�(� <br /> szattle,wa <br /> 98101 <br /> 206 467 6306 <br /> b�ffalodesign.com � <br /> � <br /> �- <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE � <br /> 3973 REGISTERED CHECKED INDEX OF DRAWINGS W5741115 0 R G 07.02.18 � <br /> ORIG WORKPLACE ENVIRONMENT INVESTMENT W5741115 BUFFALO 07.02.18 THIS DESIGN AND/OR � <br /> ARCHITECT SPECIFICATION IS APPROVED sHE� o <br /> � APPROVED BY DEPT. DATE ENGINEER TITLE WORKPLACE ENVIRONMENT INVESTMENT � <br /> � �j�l�/ � CHECKED 1 � � <br /> C�' <br /> CHRISEDWARDrARLSON APPROVED �UILDIN� 40-023 40-030 40-037 z <br /> STATE OF WASHINGTON > > JOB N0. COMP N0. <br /> W5741115 � <br /> APPROVED ARCHITECTURAL MASTER COL. N/A EVEREIT, Wq °wc Na G1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.