C D
<br /> I �
<br /> 2 , �2��VAC 3/4°�AI R G E N E R A � f� 0 T E S �
<br /> \ 1 1 /4" 3"VAC 1 1 /4"PWR I , REFER TO SHEETS M I & M I a
<br /> �� 2"IW 3/4"AIR �W� FOR SYMBOLS AND ABBREV I AT I ONS ,
<br /> � 1 1 /4"AI MATCHLINE - SEE SHEET OM112
<br /> � 4�� 4�� 2 , REFER TO SHEET Mln FOR PLUMBING
<br /> 3" � � � �� 3°� 2 1 /2" 6" 5 013 a � � „ SCHEDULES ,
<br /> � P- 13 > �
<br /> - � - - I—Q - - - - -- - - - 3 , ALL VACUUM LINES TO BE
<br /> �� > ; � 2 � � °� SLOPED I /8 " PER FOOT (M I N , )
<br /> � 2 1 2 \ 2 1 /2� 3 TO VACUUM UN I T , ,
<br /> Q / „ �
<br /> > 3 4" '� � �� VAC 2 I /2 2 I /2 � 4 , ALL AIR OUTLETS TO BE I /2 "
<br /> I / Q > I VAC I ,CO � DYNAQUIP DC-212SL QUICK DISCONNECT
<br /> 3 I 2� � � 3" 3" � / � CO � � 3" I � 023 8 UNLESS NOTED OTHERW I SE ,
<br /> I � 2 1 2" �
<br /> OM115 M548 SP- 1 2 � � _ � � z _ 5 , ALL VACUUM OUTLETS TO BE
<br /> n � 1 1 2" � c�n 2 I 2 " � 2 I /2 UNLESS NOTED OTHERWISE ,
<br /> � 3/4„ � � I �
<br /> SP- 1 2 1 � „ 2 � �2 ' 1 ,, 1 - 1
<br /> SSW 6 , NOT USED
<br /> 2 1 /2" � 2 1 /2" � „ � 1 2" I � I � � _6 » I �
<br /> / > »
<br /> „ S12 � � 020 1 1 /4" SSW F AIR1 /2" 8 " �WL FOR CONT , '� IE 95 -3 7 , ALL ( NON RESPIRATOR ) BRANCH AIR LINES .
<br /> 2 � ��1 " „ CONT.UP TO P- � , „ UP SEE SHT . IM115 SERVING QUICK DISCONNECTS SHALL HAVE
<br /> _ _ _ 3 4 - SEE SHT. 1M11 I -6 A HANSEN EXCESS FLOW AUTOMATIC SHUT-
<br /> 3 4" -Q � OFF VALVE DOWN STREAM OF BALL VALVE ,
<br /> � � �� � 1 4" � „ 1 1 4" > 2 I �2 >> 6, „ I CO „ I � I
<br /> 6 3„ i----_ 1 � „�
<br /> / � � / 2 2 1 2' I I /2 PW FOR
<br /> „ PW
<br /> $ _ '� CONT UP TO P- I 3 2 I /2 " 8. FOR SUPPORT STEEL SEE DWG 1 S1 15
<br /> 6 ,P �� A -' — A � A _ � B 7 -+t�-� 2 » SEE SH1� , I I I 5 9 , RUN A I R AND WATER RUN , „
<br /> 3 AIR 3�4„ - __ � �� ��- � � � ° _ � _ _ � � I PW � � BETWEEN 95 -0 AND 96 -0 ELEVAT I ON ,
<br /> CO \
<br /> 2>>SS - „SSW �— - , I F g » , I I
<br /> 1 " 2 1 /2 „ 2„_ „ � ��2„ 3/4 " 2 0 2 2 � � �4 ��
<br /> � 34 � P SPEC F C OTES �
<br /> 4 » � PWR 3 >> 1 C
<br /> 3/4" 2 I /2 " � 2 1 /2" SAN � 5'- " FOR CONT. SEE SHT. C-83 1� 3/4" AIR DROP TO HEAT WHE,EL UNIT.
<br /> � 1 1 /4" SSW FO � I � I I I - � MOUNT ONE AIROUTLET AT 48 A.F.F.
<br /> CONT. UP TO P- � 3 � � RWL AND ONE AT HAND RAIL OF CATWALK.
<br /> I SEE SHT. 1 M 1 1 „ � 2 1 /2" CO P- I 3A _CO � 8 -
<br /> »
<br /> - - - - - - - - - 4 _ AIR � _ � _ _
<br /> � 12"DIA SLEEVE � NOT USED
<br /> �j E--+- � I.E. 543.1 6
<br /> - � _ 1 1 /4"SSW I � 5 � I I
<br /> ���D F CAP �
<br /> 6 019 P- 13 FUTURE P- 1 1 /2" P .
<br /> SUMP � 3�3/4 " PW DROP TO 44"
<br /> _ _ _ _ _ _ _ B _ 4 , � � �� 3�4�� 4 �� 1 D � A , F , F , MOUNT ON THE COLUMN
<br /> N FOR P- 13A ( HOSE STATION ) .
<br /> SP-43 ` �
<br /> SP-44 UTURE � � � � � 024 � � 4�VACUUM UN I T D I SCHARGE OUTLET
<br /> „ DUCT TO BE EXTENDED TO
<br /> I VALVE2 9 » I 3" AMMON I A EXHAUST DUCT AND
<br /> IN VERTICAL t 1 1 4 I CONNECTED , REFER TO SHEET
<br /> I POSITION I SAN /� CONNECORONXACT ROUTING AND
<br /> I ,q— _ _ -� I I o—� I
<br /> � 3j4'� - 12 �SEEISHTFORMC05T , UP TO 4 " FD3
<br /> C O f- P � �
<br /> � g � � � � o� � 1 E I � PUMPS SP-43 & SP-44 ARE FUTURE ,
<br /> w � I � Q � � � � ��� � � " � TERMINATE PIPING AT 2 I /2 " VALVE ,
<br /> z W B - I 7� 1 /2" AIR DROP ON OUTSIDE OF MECH. ROOM
<br /> ,> > „ „ „ „ �,
<br /> � W 3/4 �2 1 2 4 WITH PIPE THRU WALL 48 A.F.F. TO A 1 /2 x1 /4
<br /> _ � � SAN � � P CEJN �10-310- 1455 QUICK DISCONNECT.
<br /> ~ I W � 3/4" E---e 1 8 4" FD3 AT LOW POINT OF R T RN
<br /> I � E U AIR PLENUM.
<br /> � � I I 1 10 � � I I I SEE STRUCTURAL DWG. SHEET S285 FOR LOCATIONS
<br /> I � IN VERTICAL PAINT BOOTHS AND SHEET S287
<br /> 1 1 / ' /2" AIR FOR LOCATIONS IN THE DOLLY PAINT BOOTH. .
<br /> 1 1 /4" SSW FOR 4�� „ 4„ 9� FUTURE 3/4" AIR DROP TO HEAT WHEEL.
<br /> COE TSHT. T�M 11 8 � I � � � 10 FIVE GALLON BLADDER EXPANSION TANK
<br /> I �
<br /> - - - - � � - - T E F I RST FLOOR SHALL NOT BE 1 1 1 1 /2" AIR LINE UP INCREASING TO 2" AIR LINE
<br /> 021 SLOPE 1 4"87 -8�� 6�� 5 �� 4" SAN WASTE FO C RE DR I LLED AT ANY LOCAT I ON
<br /> » 8 / >> 8 FROM BASEMENT TO FIRST �LOOR.
<br /> 4" 4 � 4" PER FOOT 4 � CONT. UP SEE SH A L FLOOR PENETRAT I ONS SHALL
<br /> � » z � 4" � 1M115 H VE SLEEVES SET PRIOR TO FIRST
<br /> �� CO „ �WG �CO �� 3 4 � SLOPE 1 /4 Q � P - OR SLAB POUR , R A B c �
<br /> PER FOOT � -
<br /> _ 6 SP- 1 � 6 �- V I �� � 1B �
<br /> SP 4 I WG �I
<br /> " SUMP SUMP 6„ 2 � / � 4„ �4
<br /> SP-4 31 SP- 1 23 ��� 4" P oM i i o oM i i i oM i i 2
<br /> 1 1 /4" P PWR 1 1 2" �A _ _ � 3
<br /> „ 2 1 2" „ 2„ , - - 5,_ �,
<br /> 4 � / I 4 I 1 � �� — �� � I OM I I 3 I OM I I 4 M I I 12
<br /> CO � _ 6 �
<br /> �, I
<br /> IW IW I CO 2 1 / " 4" � 8 � FOR CONT SEE SHT. C-83 oM � � 6 oM � � 7 OM I I 8
<br /> MATCH LINE � ' " RW� — 11
<br /> I — —
<br /> SEE SHEET OMI 18 oM � � g OM120 oM � 2 �
<br /> 1 1 /4"PW 1 1 /2"HV�/C - - I I , 5
<br /> 3'-0" 1�
<br /> CW, HW & HWC UP 12"DIA SLEEVE
<br /> 8" RWL FOR CONT. UP FOR CONT SEE SHT I.E. 543.16 KEY PLAN N
<br /> SEE SHT. 1 M 1 15
<br /> I M I I �J N.T.S. SECTION LEfTER
<br /> / OR \
<br /> PART A � P � A �1 FOR REFERENCE 4NLY SECTIONDETAILNUMBER
<br /> SCALE ; I /8 " = 1 ' -0 " KEY SFROM ONE� �
<br /> ' " & D E T A I L TAKEN SHOWN
<br /> (FIN. FLR.=75 -0 ) FACILITY DESIGN BY CE I DATE 07 , 02 , I 8
<br /> 0 4' 8' 16' 2 4'
<br /> SYM REVISION BY APPD. DATE SYM REVISION BY APPD. DATE ACC EPTAB)LITY DRAWN BY DATE SUBTITLE P L U M B I N G B A S E M E N T P L A N �ST REVISION SYM DATE
<br /> ❑ AUBURN, WA. 98002 THIS DESIGN AND OR D. FARR
<br /> RECORD DWG , - LOCKWOOD GREENE 03/94 EVERETT, WA. 98201 SPECIFICATION IS APPROVED �TGALLI� 3/2/92 AREA I 5 SHEET OF ,
<br /> BOE'�� ❑ KENT, WA. 98031 APPROVED BY DEPT. DATE EE.GAMB D BY 3�2�g2 TITLE O M ( I �
<br /> ❑ PORTLAND, OR. 97220 CHECKED
<br /> FACILITIES DEPARTMENT � RENTON, WA. 98055 R� 1/18/92 M E C H A �1 C A � M A S T E R J 9B 297.04/91431 .03 COMP.NO._
<br /> ❑ SEATTLE, WA. 98124 APPROVED
<br /> RK 1/�s/92
<br /> APPRovE� BLDG 40-37 COL C-D/12- 13 EVERETT owc. No. 40-37- OM 1 15
<br /> LE �/�a/s2
<br /> DESIGNER:
<br />
|