My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Corrosion Engineering 3/26/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
Northwest Corrosion Engineering 3/26/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 9:39:22 AM
Creation date
4/2/2019 9:39:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Corrosion Engineering
Approval Date
3/26/2019
Council Approval Date
3/13/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
Cathodic Protection and Coating Evaluation
Tracking Number
0001691
Total Compensation
$102,201.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B - COMPENSATION <br /> FEE SCHEDULE -NORTHWEST CORROSION ENGINEERING <br /> EFFECTIVE: 01/01/19— 12/31/20 <br /> A. PERSONNEL CHARGES: RATE PER HOUR <br /> PROFESSIONAL SERVICES: <br /> Principal 195.55 <br /> NACE Cathodic Protection Technician 102.78 <br /> NACE Level 3 Coating Inspector 133.14 <br /> NACE Level 1 and 2 Coating Inspector 99.97 <br /> OTHER SERVICES: <br /> Administration 77.35 <br /> Northwest Corrosion Engineering • (360)391-1041 <br />
The URL can be used to link to this page
Your browser does not support the video tag.