Laserfiche WebLink
/s.:>: <br /> INSPECTION REPORT <br /> ,' Date /‹r (? Permit: ( (}("' 0 OS <br /> Contractor: 7/ 7:4—f-1 <br /> Owner: /3_©eta6 <br /> Site Address: 36):0" EI..) C"true) <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> 111,- • • • ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> 2 Ceiling Grid El Drywall Nailing ❑Plumbing Final <br /> ilf.lactrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ■ •• .-_ : .. s ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: _P_O 6 -___y_ 3=J q 3Li <br /> ______________ <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMI <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881FORREINSPECTION—24 hour notice required <br /> 0`V---- 1 l r(JAi— % A —T <br /> Inspector:4:), Date: ' / 1 <br /> EIR(10/06) DATABAR,INC. <br />