Laserfiche WebLink
Sa ri6e 3 <br />_ INSPECTION REPORT <br />Address <br />v N <br />Contractor�l�—�T�—.�. <br />OwnerL� N G <br />Date <br />PPROVAL J PARTIAL APPROVAL <br />J VIOLATION J CORRECTION REQUESTED <br />Corrections listed below MUST BE MADE before work can be approved. <br />j Please contact inspector and arrange for appointment. <br />Was not able to perform inspection. <br />j CALL 259-SBIG FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />n� u i�tXL6�! _G_L�4TB-[SdL�_ff1/f� <br />Inspector <br />J Temp. Elect. <br />J Footing <br />J Foundation <br />LI Ductwork <br />❑ Wood Stove <br />J Masonry <br />Date <br />1YPE OF INSPECTION REOUESTED / " <br />J Framing <br />J Gas Pi ing <br />JD rywall. Nailing <br />U shear Nailing <br />J Consultation <br />dwor <br />Groundwork <br />O <br />J Grid <br />St . Slab <br />J Roughen <br />U Final <br />J Ins anon <br />y"Other <br />J BLDG: Prof. No. ( ❑ MECH: Prof. No. — <br />XELEC: Prof. No. ❑ PLBG: Prof. No -- — <br />