Laserfiche WebLink
COMPBIHIHSIUI <br />Nll[ ivauBI <br />OISIGH <br />SIBUI(IS. IHI <br />103 mess <br />Blaine St <br />Seaule <br />JJA 11011 <br />I20S1 <br />W 4261 <br />Onhi ecture <br />Iniman Design <br />Space Plaomoq <br />Prplcct Managemem <br />MEMORANDUM <br />Date: April 11, 1994 <br />To: Jeff McFall <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 <br />(o MMM <br />u u APR 12 1c 4 <br />................. <br />C1l r' OF EVERETT <br />Ii14R, P,:rmit Counter <br />From: Craig Hanway <br />Comprehensive Architecture & Design Services, Inc. <br />303 West Blaine Street <br />Seattle, WA 98119 <br />Re: Everett Clinic Tenant Space <br />First Interstate Bank Rucker Building <br />4205 Rucker Avenue <br />Plan Check #B-43780 <br />Attached are two corrected sets of Construction Documents for the above <br />project, showing revisions in response to your review comments, dated April <br />6, 1994. <br />1. 1 have redone my architect's stamp & signature on all five <br />sheets so they are more legible. <br />4, 7. In response to your concerns to provide separation between <br />the stair and elevator shaft, we are showing fire -rated <br />galvanized steel roll -up curtains, with guide tracks mounted <br />beside the elevator door frames, and the hood concealed <br />within the ceiling assembly. These are,convolled by smoke <br />detectors, which will automatically close the fire curtain in case <br />of fire, closing off the elevator shaft, and providing separation <br />from the stair. This is shown on the Refl. Clg. Plans on <br />sheets A-3 & A-4. <br />10. Door #3 has been eliminated, and doors #8 & #10 have <br />been corrected to show the required maneuvering clearances. <br />These corrections are made to sheet A-1. <br />11. The contractor has discontinued work at the site. No further <br />work will take place until your concerns are addressed, and <br />a permit is issued. <br />Please call if I can be of any assistance, or if you need additional <br />information. <br />