My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018 (2)
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
IMCO General Construction Inc 11/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2019 11:19:07 AM
Creation date
4/5/2019 11:05:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
End Date
4/17/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Ib. Contractor must provide a letter from its Corporate Risk Manager, or appropriate Finance <br /> Officer representing and warranting the following minimum information: whether the self- <br /> I insurance program is actuarially funded; the fund limits; any excess declaration pages to meet <br /> the Contract requirements; a description of how Contractor would protect and defend the Owner <br /> as an Additional Insured in their Self-Insured layer; and claims-handling directions in the event <br /> of a claim. <br /> I c. Any amounts due to,sought by, or paid to third party claimants shall be the sole responsibility of <br /> the Contractor, irrespective of whether such amount falls wholly within the level or amount of <br /> the Contractor's self-insured retention. <br /> ARTICLE 16 LAWS, REGULATIONS AND PERMITS <br /> A. GENERAL <br /> IA. The Contractor shall give the Notices required by law and comply with all laws, ordinances, rules and <br /> regulations pertaining to the conduct of the Work. <br /> 111 B. The Contractor shall be liable for violations of same in connection with Work provided by the Contractor; <br /> and Contractor shall cooperate with all governmental entities regarding inspection of the Work and <br /> compliance with such requirements. <br /> IC. If the Contractor observes that the Drawings, Specifications or other portions of the Contract Documents <br /> are at variance with any laws, ordinances,rules or regulations,he or she shall promptly notify the Owner's <br /> IRepresentative in writing of such variance. <br /> D, The Owner will promptly review the matter and, if necessary,take appropriate action. <br /> I E. Contractor agrees not to perform Work it knows, or in the exercise of ordinary care should know, to be <br /> contrary to any laws,ordinances,rules or regulations. <br /> B. PERMITS AND LICENSES <br /> I <br /> A. Securing and Payment. <br /> Unless otherwise specified, permits and licenses from governmental agencies, which are necessary <br /> II. <br /> only for and during the prosecution of the Work and the subsequent guarantee period, shall be secured <br /> by the Contractor and paid for by the Owner. <br /> 2. Permits and licenses of regulatory agencies that are necessary to be maintained after expiration of the <br /> Iguarantee period will be secured and paid for by the Owner. <br /> B. The City of Everett Utilities Department has reviewed and commented on the Drawings in this Contract. <br /> IC. Erosion Control Plan. <br /> 1. If required, submit an erosion control plan that depicts the best management practices that will be <br /> I followed for erosion control. <br /> a. The Contractor may use the plans in this Contract. <br /> 1 The fee for this permit will be waived by the City of Everett. <br /> ID. Electrical permits can be obtained at: <br /> City of Everett <br /> I 3200 Cedar Street—2'Floor <br /> Everett, WA 98201 <br /> Phone: 425/257-8800 <br /> I10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL CONDITIONS <br /> 1 00 72 13-61 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.