My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018 (2)
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
IMCO General Construction Inc 11/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2019 11:19:07 AM
Creation date
4/5/2019 11:05:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
End Date
4/17/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor and City agree as follows: 1 <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax,the amount of the change order for the changes <br /> described in Exhibit A, represents complete compensation for the changes described in Exhibit A, <br /> including all direct and indirect costs and impacts.The contract price shall be adjusted as described in <br /> this Change Order. I <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the Mayor or his designee <br /> is authorized to direct Contractor to perform additional work.In calculating such threshold amounts, <br /> Washington State sales tax,if applicable to the Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change Order. <br /> 5. Contractor waives and releases any and all claims arising out of,or related to,this Change Order,the <br /> work described in Exhibit A,and all work and actual or constructive changes that occurred or began <br /> prior to the date of this Change Order,including, but not limited to,claims for equitable adjustment of <br /> time and compensation,delay, impact,overhead,or inefficiencies. This provision does not apply to <br /> requests for equitable adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest,dispute,claim or Contract Claim as required by the Contract <br /> Documents. If the Contract Documents establish a time period for notice of a differing site condition, <br /> protest,dispute,claim,or Contract Claim that ends after the date of this Change Order,but relates to <br /> work performed prior to the date of this Change Order,then this provision does not apply if the <br /> Contractor timely and properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the extent explicitly <br /> provided herein. I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> CHANGE ORDER-AGREED <br /> 00 63 63-2 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.