My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018 (2)
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
IMCO General Construction Inc 11/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2019 11:19:07 AM
Creation date
4/5/2019 11:05:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
End Date
4/17/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> c. Suspension Procedures 23 I <br /> d. Termination Procedures 23 <br /> e. Possession and Use of Completed Portions of the Work 25 <br /> f. Possession of Incomplete Portions of the Project 26 <br /> g. Substantial Completion 26 <br /> h. Acceptance of Work 27 <br /> ARTICLE 6 CHANGES 27 <br /> a. Owner's Right to Direct Changes to the Work 27 <br /> b. Extra Work 27 <br /> c. Change Orders 27 <br /> d. Value Engineering and Cost Sharing 28 <br /> ARTICLE 7 LABOR STANDARDS 28 <br /> a. Wages of Employees 28 <br /> b. Payment Certificates 29 <br /> c. Hours of Labor 29 <br /> d. Contract Work Hours 30 <br /> e. Overtime Work 30 <br /> f. Labor Relations 30 <br /> ARTICLE 8 MATERIAL,EQUIPMENT, WORKMANSHIP AND CONSTRUCTION UTILITIES 31 <br /> a. General 31 <br /> b. Product Data 31 <br /> c. Quality 31 II <br /> d. Material and Equipment Specified by Name 31 <br /> e. Requests for Substitution 31 <br /> 111 <br /> f. Demonstration of Compliance with Contract Requirements 32 <br /> g. Defective Work 33 <br /> h. Materials and Equipment Furnished by Owner 34 I <br /> i. Guarantee 34 <br /> j. Correction Period 35 <br /> ARTICLE 9 MEASUREMENT AND PAYMENT 36 <br /> I <br /> a. Payments to Contractor 36 <br /> b. Payment for Changes 39 <br /> c. Charges to Contractor 40 <br /> d. Compensation to Owner for Time Extension 41 <br /> e. Adjustment of Contract Sum 41 <br /> f. Unabsorbed and Extended Overhead 42 <br /> g. Force Account 42 <br /> h. Labor. 43 <br /> i. Materials. 43 <br /> j. Equipment. 44 <br /> I <br /> k. For Services 44 <br /> I. For Mobilization 45 <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL CONDITIONS <br /> 00 72 13-ii Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.