My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2821 HEWITT AVE NW TELCO 2018-01-01 MF Import
>
Address Records
>
HEWITT AVE
>
2821
>
NW TELCO
>
2821 HEWITT AVE NW TELCO 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 8:32:43 AM
Creation date
4/12/2019 8:32:26 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
2821
Tenant Name
NW TELCO
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f� <br /> ��� <br /> � <br /> � <br /> � <br /> i <br /> _ <br /> _ <br /> I � ACCEPTANCE T'EST PROCEDURE NO. SS89-1023 <br /> '� Upper Ploor Loan Work Room � <br /> i . � <br /> �+ JOB N11ME: Northwest Telco Credit Union , <br /> ' �+ LOCATION: 2809 Hewitt 1lvenue <br /> � � Everett, Washington <br /> ' TYPE SY3TFI�l: Halon Fire Suppreasion Syatem <br /> r! <br /> � ; <br /> ii <br /> ` DATE: INSTALLATION SUPERVISOR: <br /> . � <br /> �,� <br /> P� 1_0 SCOPE � <br /> ' This Acceptence Test Procedure (ATP) describes the <br /> � ('"; functional tests required to verify that the installed fire <br /> �,J protection sYstem functions as intended by the desi3n <br /> drawings end contract specifications . <br /> ; � <br /> �-� 2.0 REFERENC£S <br /> � . 2. 1 Engineered Fire SYstems Drawinss. <br /> �.. <br /> 3.0 RE3PON3IBILITIES <br /> ,� 3. 1 Approval Parties for acceptance testing shall be the <br /> owneY's repYesentative . <br /> � � 3. 2 On completion of the test, the designated <br /> � representatives shall sign the approval sheet in the <br /> space provided for witnesses, whether or not exceptione � <br /> � have been taken to the results obtained during the <br /> � <br /> test. <br /> 3.3 Should any of the approval parties object to the <br /> ' � � results obtained during the acceptance testing, he <br /> r, shall so notify the Contractor's Field Engineer. Any <br /> such not � � given verballY shall be confirmed in <br /> writing within forty-eight (48) hours aft.er Performance <br /> ' of that portion of the test to which exceptions is <br /> �.. taken. The notice shall summarize the objections and <br /> shall state the reason:� for same. <br /> � � , <br /> M <br /> 1!� <br /> �LL' <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.