Laserfiche WebLink
f <br /> I <br /> � <br /> I <br /> I� <br /> I <br /> � <br /> f <br /> H � . _ <br /> ; <br /> F � <br /> � . <br /> � <br /> r <br /> � r <br /> � � <br /> .. <br /> 4.0 TEST PREPIIR)1TIONS . <br /> I � q. 1 E�U I PMENT RE4U I RED <br /> � <br /> ---- 4. 1 . 1 Ionization Detector Tester. <br /> i r <br /> � I <br /> �a <br /> ; 4.2 TEST CONDITIONS - GENERAL <br /> i „� <br /> ---- 4. 2. 1 NotifY interested parties that sYstem tests <br /> ` iM nre beginning. <br /> � - - 9.2.2 VerifY that all ionization detectors Y�ave <br /> � been properlY tested and adjusted as <br /> + "' required. <br /> f <br /> � �' ---- 4 .2.3 VerifY that all other tests have been <br /> „� completed. <br /> � ---- 4.2.4 VisuallY inspect the installation of all <br /> equipment to verifY that it is properlY <br /> ' � mounted. <br /> ' ,.. ---- 4.2.5 Install a flashbulb across each agent <br /> ' I � container initiator cable assemblY. Verify <br /> "' that all initiator circuits are connected to <br /> ' the control pnnel . After the flashbulb test <br /> �-! has been performed as outlined in Table II , <br /> , � connect a test lamp across the initiator <br /> circuit in the control panel . <br /> ' ;", --�-- 4.2 . 6 App1Y Power to the system. VerifY that the <br /> ;.. system is in normal supervisory condition <br /> (power lamp is "on" and all other lamps and <br /> „ audible devices are "off") . <br /> i. I <br /> � e <br /> i Ii� <br /> ia <br /> Yr <br /> I � <br /> �1 F <br /> Ir <br /> ..� <br /> +� <br />