My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/04/10 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/04/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 9:20:43 AM
Creation date
4/16/2019 9:19:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Accept the Notice of Bid Error Briefing COUNCIL BILL# <br /> from Strider Construction Co. Proposed Action Originating <br /> Inc., and award the bid for the Department Public Works <br /> Alverson Stormwater Consent Contact Person Arnie Roshak, PE <br /> Separation Project to Rodarte X Action Phone Number 425-257-7249 <br /> Construction, Inc.,in the First Reading FOR AGENDA OF April 10,2019 <br /> amount of$1,460,182.00 Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> Administration <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Northwest Neighborhood 2/13 —Call for Bids Location Map PW, Legal <br /> along Alverson and Bid Summary <br /> Grand Ave from 5th to 9th Notice of Bid Error with <br /> St and 9th Street from attachments <br /> Rucker to Grand Ave. - Letter from City <br /> Amount Budgeted $1,750,000.00 <br /> Expenditure Required $1,460,182.00 Account Number(s): UP 3660 <br /> Budget Remaining $289,818.00 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Alverson Stormwater Separation Project is Phase 3 of the Northwest Stormwater Separation Project, <br /> which will install a new separated storm drain system in the right-of-way_. The project is needed to address <br /> surface and basement flooding and capacity issues with the existing combined sewer system. <br /> Bids were opened on March 19,2019, and thirteen(13)bid proposals were received for the construction of <br /> the Alverson Stormwater Separation project. On March 20,2019,the City received the Notice of Bid Error <br /> from Strider Construction Co. Inc., and request of relief of responsibilities from contract award in accordance <br /> with the bid specifications. With Council's acceptance of Strider's bid error declaration,Rodarte <br /> Construction Inc. becomes the lowest responsive and responsible bidder at a price of$1,460,182.00. City <br /> staff recommends that Rodarte Construction Inc. be awarded the construction contract for Alverson <br /> Stonuwater Separation project in the amount of$1,460,182.00. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Accept the Notice of Bid Error from Strider Construction Co. Inc., and award the bid for the Alverson <br /> Stormwater Separation project to Rodarte Construction,Inc.,in the amount of$1,460,182.00. <br /> 151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.