Laserfiche WebLink
Intake &Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT#If` \ O -CO J <br /> BUILDING PLANNING - <br /> Intake OK by: Date: Intake OK by: Date: <br /> Intake Comments: Intake Comments: Assign To: <br /> ❑ Route to Commercial Building 0 Attach to Project No. <br /> ❑ Route to Residential Building 0 Route to Historic Reviewer <br /> ❑ Make this a"W"Permit 0 OK to Route to Other Departments <br /> Bldg/TI/Addn/Rem Size 0 Hold in Planning File Drawer <br /> Garage/Accessory Struct. Size Zone ''E 1. Hob <br /> Number of Stories Overlay/Agreement t-\0 O i LRAr <br /> Basement ❑No ❑Yes, Fin/Unfin Nonresidential Use J .A <br /> Type of Construction Residential Use <br /> Occupancy Group Proposed No. of Dwelling Units: <br /> Occupancy Load Total No. of Dwelling Units: <br /> Fire Sprinklers: DUpdate Existing ONew System ❑Not Req'd Planning/Landscape Inspection Required before Final? ❑Yes [BNo <br /> Reason Sprinklers Required: "In Lieu" Fee:Type: Amount$ <br /> Fire Alarm: DUpdate Existing ❑New System ❑Not Req'd School Impact Fee: Total $ <br /> Reason Fire Alarm Required: Calculated: Gres' . <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes 0 No ❑Everett School Dist ❑Mukilt--o School Dist <br /> Add'I RCW 64.55 docs required prior to final? DYes ❑No Additional Notes: c <br /> c � �ter��- L ) _ _ )��,,,� <br /> VALUATION CALCULATION: Total.$ IvLc,W W11,,L ,¢.siti.).1,-, e) arct,,,46%-x,1 Screa,Mrse) <br /> Approved By: Y.\,1 A Date: j b--Z.is‘ <br /> PUBLIC WORKS <br /> Intake OK by: Date: <br /> Additional Notes: Intake Comments: PW Worksheet Needed if: <br /> ❑Sys Dev Eval ❑Traffic Mit Eval <br /> / ❑Site Work or Drainage Proposed <br /> Approved By` �L/ Date: 4/26/24•4 ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> supportive housing) <br /> FIRE DEPARTMENT DRoute this folder for PW Review at end ---PW Review Worksheet <br /> Intake: (Needed for Townhomes,Alley load SFR,New Commercial) ❑This project also has a separate concurrent PW Review(Green Folder) <br /> ❑Route to Fire Drawer---Fire Preliminary Review Notice AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> ❑Sending Fire Notes to Project Team 0 This Permit is Approved by Public Works <br /> Date: (OK to Route to Other Departments) ❑ See PW Review Worksheet and associated attached items <br /> Fire Sprinklers: ❑Update Existing ❑New System 0 Not Req'd 0 A Separate PW Permit is Required (Permit#: PW ) <br /> Fire Alarm: DUpdate Existing ❑New System 0 Not Req'd AND 0 Is located in this folder <br /> Chemical Sup: DUpdate Existing ❑New System ❑ Not Req'd 0 Is in a Separate Green Folder(join with this folder for permit issuance) <br /> Additional Notes: ❑ Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> Approved By: Date: 0 Public Works has no scope---PW Not Required <br /> Additional Notes: <br /> ELECTRICAL <br /> Additional Notes: <br /> Approved By: Date: Approved By: Date: <br />