My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3927 RUCKER AVE 2ND FLOOR 2019-04-17
>
Address Records
>
RUCKER AVE
>
3927
>
2ND FLOOR
>
3927 RUCKER AVE 2ND FLOOR 2019-04-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2019 7:27:00 AM
Creation date
4/17/2019 7:26:58 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3927
Tenant Name
2ND FLOOR
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lighting, Motor, and E.ectrical Permit Checklist, Pg. 3 LTG-CHK <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2,R3,R4 over 3 stories and all R1 Revised Nov 2017 <br /> The Everett Clinic-Hand Therapy Remodel Date 8/30/2018 <br /> The following information is necessary to check a permit application for compliance with the lighting,motor,and electrical requirements in the <br /> Applicability Location in Building Department <br /> (yes,no,na) Code Section Component Compliance information required in permit documents Documents Notes <br /> MOTORS,TRANSFORMERS, ELECTRIC METERS, INTERIOR TRANSPORTATION <br /> NA C405.6 Electrical Include electrical transformer schedule on electrical plans; <br /> transformers indicate transformer size,efficiency,or exception taken <br /> Dwelling unit Indicate on electrical plans that each dwelling unit in Group R-2 <br /> NA C405.7 electrical energy has a separate electrical energy meter <br /> consumption <br /> Electric motor Include all motors,including fractional hp motors,in electric <br /> NA C405.8 efficiency motor schedule on electrical plans;indicate hp,rpm,rated <br /> efficiency,or exception applied <br /> For luminaires in each elevator cab,provide calculated average <br /> efficacy of combined fixtures that indicates efficacy is not less <br /> than 35 lumens per watt; <br /> NA C405.9.1 Elevator cabs Indicate rated watts per cfm for elevator cab ventilation fans do <br /> not exceed 0.33 watts per cfm; <br /> Indicate automatic controls that de-energize lighting and <br /> ventilation fans when elevator is stopped and unoccupied for a <br /> period of 15 minutes or more <br /> Escalators and Indicate escalators comply with ASME A17.1/CSA B44; <br /> NA C405.9.2 moving walks automatic controls are configured to reduce operational speed <br /> to the minimum permitted when not in use <br /> NA C405.9.3 Regenerative drive Indicate all one-way down or reversible escalators are provided <br /> with a variable frequency regenerative drive <br /> DOCUMENTATION AND SYSTEM REQUIREMENTS TO SUPPORT COMMISSIONING(Cx) <br /> Indicate that all electrical systems(receptacles,transformers, <br /> motors,vertical and horizontal transportation)for which the <br /> WSEC requires control functions and/or configuration to <br /> Scope of electrical perform specific functions are required to be commissioned; <br /> power and lighting <br /> NA C408.3 Where total building lighting load is>20 kW,or where total <br /> systems <br /> commissioning lighting load of luminaires requiring daylight sensing and/or <br /> occupancy control>10 kW,indicate that all automatic lighting <br /> control systems are required to be commissioned;or provide <br /> building lighting power calculation demonstrating eligibility for <br /> exception; <br /> Indicate Cx requirements in plans and specifications for all <br /> applicable electrical and lighting control systems per C408; <br /> Include general summary with at minimum Items 1 thru 4 of the <br /> C405.13 Cx plan per C408.1.2 including:narrative description of <br /> C408.1.1 Commissioning activities,responsibilities of the Cx team,schedule of activities <br /> NA C408.1.2 requirements in including verification of project close out documentation per <br /> C408.1.4.2 construction C103.6,and conflict of interest plan(if required); <br /> C103.6 documents <br /> Include in general summary that a Cx project report or <br /> Compliance Checklist(Figure C408.1.4.2)shall be completed <br /> by the Certified Cx Professional and provided to the owner prior <br /> to the final electrical inspection <br /> Functional Identify in plans and specifications the intended operation of all <br /> NA C408.3.1 performance testing equipment and controls during all modes of operation,including <br /> criteria interfacing between new and existing-to-remain systems <br /> PROJECT CLOSE OUT DOCUMENTATION <br /> Indicate in plans that project close out documentation is <br /> Project close out required including WSEC lighting compliance forms and <br /> NA C103.6.3 documentation calculations that document all interior and exterior lighting area <br /> requirements and/or surface types,lighting power allowances and installed <br /> densities <br /> If"no"is selected for any question, provide explanation: <br /> 67/L: <br />
The URL can be used to link to this page
Your browser does not support the video tag.