My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
303 SKYLINE DR 2019-04-17
>
Address Records
>
SKYLINE DR
>
303
>
303 SKYLINE DR 2019-04-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2019 8:55:44 AM
Creation date
4/17/2019 8:55:43 AM
Metadata
Fields
Template:
Address Document
Street Name
SKYLINE DR
Street Number
303
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40. PUBLICS/ORKS PERMIT Date Applied: 3/30/2018 <br /> City of Everett Public Works Department Public Works Permit#: PW1803-071 <br /> 3200 Cedar Street <br /> Parent Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> ° (425)257-8810 Public Works Fee: $65.00 <br /> 3 0 MAR 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MCKENZIE JANE & STEVE MCKENZIE JANE &STEVE <br /> 303 SKYLINE DR 303 SKYLINE DR <br /> EVERETT,WA, 98201 EVERETT, WA, 98201 <br /> PHONE: 3607945060 PHONE: 3607945060 <br /> TAX PARCEL ID#: 00520300005300 SITE ADDRESS: 303 SKYLINE DR <br /> DESCRIPTION: REDO EXISTING CONCRETE DRIVEWAY <br /> EXPAND AND REPLACE EXISTING DRIVEWAY(20'WIDE X 36' DEEP)AND INSTALL SOD OR LANDSCAPE ROCK(8' <br /> WIDE X 36' DEEP). <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 3/30/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation, to evaluate Erosion/Sedimentation control set-up, and with all other inspection requests. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever <br /> requires use of the right-of-way for municipal purposes. <br /> 10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Call the inspection line to <br /> request a Final for this permit when all items have been completed. <br /> Public Works Permit Fee Breakdown: <br /> Paving (720SF) $45.00 <br /> PW Site Inspection $20.00 <br /> MAR 302018 <br /> CITY OF EVERETT <br /> Permit Services <br /> City ofEverett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> I <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> 4,► 3 5V ((JJ�y expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) ate for and further agr-- to remove same upon notice from the City and to <br /> rept. - . .lic ope damaged thereby. <br /> ,,.__ <br /> FINAL INSPECTION Date - ry® - <br /> Approved as Constructed (PW Inspector) • ure of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> f l� <br />
The URL can be used to link to this page
Your browser does not support the video tag.