Laserfiche WebLink
} INSPECTION REPORT <br /> /� _ _ Date fill�_l/g Permit: f` I/,0 <br /> Contractor:2/u / iW <br /> Owner: 5a <br /> Site A.. s: SY- ' <br /> jilG "' TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING. <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service []Framing ❑Rooftop Units ❑Water Service <br /> El Grounding []Insulation ❑Mechanical Final ❑Medical Gas <br /> El coiling Grid []Drywall Nailing ❑Plumbing Final <br /> Electrical Final []Shear Nailing GAS PIPE <br /> SITE WORK []Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains []Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains []Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION ^ _ <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector:j Date: /06 ife <br /> EIR(10/06) DATABAR,INC. <br />