My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2916 STATE ST BSNW LLC 2019-04-17
>
Address Records
>
STATE ST
>
2916
>
BSNW LLC
>
2916 STATE ST BSNW LLC 2019-04-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2019 9:52:55 AM
Creation date
4/17/2019 9:52:42 AM
Metadata
Fields
Template:
Address Document
Street Name
STATE ST
Street Number
2916
Tenant Name
BSNW LLC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS <br /> 1 <br /> ENGINEERING /PUBLIC SERVICES DEPARTMENT <br /> April 19, 2016 <br /> Brian Knopf <br /> pickensmountainfarm@gmail.com <br /> RE: Owner: Swallwell's First LLC <br /> Job Address: 2916 State St ste. 102 <br /> Plan Check No: 61604-020 <br /> Dear Mr. Knopf, <br /> In response to your application for a construction permit, your plans have been examined and you are <br /> advised that revisions may be necessary before a permit can be issued. Please review and respond to the <br /> comments below.These comments address building issues only. Additional revisions or additions may be <br /> required by other departments (such as Utilities, Planning or Fire). All references refer to the 2012 <br /> International Building Code (IBC), the 2012 International Fire Code (IFC),the 2012 International <br /> Mechanical Code (IMC), and the 2012 International Energy Conservation (IECC), as amended by the <br /> State of Washington and adopted by the city of Everett.The current IBC referenced standard for <br /> accessible design is the 2009"Accessible and Usable Buildings and Facilities"(ICC/ANSI A117.1). Federal <br /> ADA, FHA, and HUD regulations and standards, including the Fair Housing Accessibility Guidelines may be <br /> more restrictive. <br /> In order for the processing of your application to continue, it will be necessary to provide the <br /> Building Division with two complete new sets of construction documents reflecting the <br /> corrections requested. <br /> 1. Submitted construction documents for permit must contain all information necessary to <br /> verify compliance with WAC 51-54A-3800. <br /> If you have any questions, please call me at 425-257-7264. <br /> Upon submittal of the drawings, your application will be given priority and plan reviews will recommence. <br /> All required submittals shall be sufficient detail and contain sufficient information to ensure that the <br /> proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> tr � <br /> Steve Miller <br /> Associate Engineer <br /> 7 „, <br /> (2_, <br /> CITY OF EVERETT.3200 Cedar Street• Everett, WA 98201 • (425) 257-8200• Fax (425) 257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.