Laserfiche WebLink
• <br /> • <br /> • <br /> primary step or component. A piping and instrumentation diagram (PID <br /> or PI&D) may be provided but is not required. <br /> 9. Analysis of the vessel (s) if pressurized beyond standard at- <br /> mospheric pressure, Analysis shall include purchased and fabricated <br /> components. <br /> 10... Structural analysis for the frame system supporting the <br /> equipment. <br /> 11. Process safety analysis of the extraction system, from the <br /> introduction of raw product to the end of the extraction process. <br /> • 12. Comprehensive process hazard analysis considering failure <br /> modes and points of failure throughout the process. This portion of <br /> the review should include review of emergency procedure information <br /> • provided by the manufacturer of the equipment or process and not that <br /> of the facility, building or room. <br /> 13. Review Of the assembly instructions, operational and mainte- <br /> ' nance manuals provided by the manufacturer. <br /> 14. Report shall include findings and observations of the analy- <br /> sis. <br /> 15. List of references used in the analysis. <br /> 3802.3.3.5 Building analysis. If the technical report, or manufactur- <br /> ers literature indicate specific requirements for the location, room, <br /> space or building, where the extraction process is to occur, the engi- <br /> neer of record, as approved in 3802.3.3.4.1 shall review the construc- <br /> tion documents of such location, room, space or building and provide a <br /> report of their findings and observations to_ the fire code official. <br /> Analysis shall include; <br /> 1. Process safety analysis of the entire process from raw materi- <br /> al to finished product. <br /> 2. Comprehensive process hazard analysis considering failure <br /> modes and points throughout the process. Should include revzew. . of <br /> emergency procedures as related to the equipmentor process, and the <br /> facility. <br /> 3802.3.3.6 Site inspection. Prior to operation of the extraction <br /> equipment, if required by the fire code official, the engineer of re- <br /> cord, as approved in 3802.3.3.4 .1 shall inspect the site of the ex- <br /> • <br /> traction process once equipment has been installed for compliance with <br /> the technical report and the building analysis. The engineer of record <br /> shall provide a report of findings and observations of the site in- <br /> spection to the fire code official prior to the approval of the ex- <br /> traction process. The field inspection report authored by engineer of <br /> record shall include the serial number of the equipment used in the <br /> process and shall confirm the equipment installed is the same model <br /> and type of equipment identified in the technical report. <br /> 3802.3.3.7 Post-process purification and winterization. Post-process- <br /> ing and winterization involving the heating or pressurizing of the <br /> miscella to other than normal pressure or temperature shall be ap- <br /> proved and performed in an appliance listed for such use. Domestic or <br /> commercial cooking appliances shall not be used. The use of industrial <br /> ovens shall comply with Chapter 30. <br /> EXCEPTION: An automatic fire extinguishing system shall not be required for batch-type Class A ovens having less than 3.0 cubic feet of work space. <br /> 3802.4 Construction requirements. <br /> 3802.4.1 Location. Marijuana extraction shall not be located in any <br /> building containing a Group A, E, I or R occupancy. <br /> OTS-7182.5 <br />