Laserfiche WebLink
Essential Process Engineering <br /> Pressure Relief Valve Installed <br /> Hi Tek Steel 1000 psig between ball valve and Tee <br /> Ball Valve <br /> i MIN IBIE- See Calculation for Quantity <br /> I It -%) <br /> e ,.: <br /> -, 4. r.; _. . <br /> Inline Connection �: ,: <br /> Tee Valve • <br /> ': <br /> f.: <br /> Y <br /> Figure 4.3—Material Vessel Cap Configuration <br /> I <br /> 1 <br /> The top cap assembly,shown in Figure 4.3, includes a Solid End Cap (4 inch sanitary connection diameter) modified <br /> to include a threaded section for%" NPT fittings. The end cap assembly as shown in Figure 4.3 is typical when <br /> installed for an Active Recovery system. For passive recovery the pressure gauge may be omitted but all other <br /> components are required. The end cap assembly includes (3)JW-LOK RV1 Series pressure relief valves or a PRV of <br /> required flow rate (see calculations), HI-TEK ball valve and high pressure tri-clamp. <br /> High Pressure Tri-Clamp Fittings (Typical at all sanitary connections) are made of ASTM A 276 316 Stainless Steel. The <br /> connection assembly includes a PTFE Tri-Clamp Ferrule Gasket between mating pipe and end cap. <br /> 5/3/2016 Project: 1604141_BrianKnopf_Extractor Page 9 of 34 <br /> EPE Doc. 160414ER Confidential- Proprietary Document Butane USE ONLY <br />