My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2916 STATE ST BSNW LLC 2019-04-17
>
Address Records
>
STATE ST
>
2916
>
BSNW LLC
>
2916 STATE ST BSNW LLC 2019-04-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2019 9:52:55 AM
Creation date
4/17/2019 9:52:42 AM
Metadata
Fields
Template:
Address Document
Street Name
STATE ST
Street Number
2916
Tenant Name
BSNW LLC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• I <br /> or <br /> Essential Process Engineering <br /> 5.7.2 Pressure Relief Devices. Pressure relief valves have been installed at each vessel that can be closed. There are <br /> three(3)pressure relief valves installed. <br /> 5.7.3 Overfilling Prevention Devices. The DOT certified container is never filled beyond it's original supplied capacity. <br /> Butane is recycled to its original container and weighed to determine the amount of Butane recovered. <br /> 5.7.6 Pressure Gauges. Compatible pressure gauges are installed. <br /> 5.7.7 Other Container Connections. The process requires bi-directional ball valves. <br /> 5.9.3 Pipe and Tubing. All piping and tubing have been sized and selected to meet the pressure requirements and <br /> compatibility requirements of this process and the chemical. <br /> 5.9.4 Fittings for Metallic Pipe and Tubing <br /> 6.7.2 Installation of Pressure Relief Devices(See 5.7.2, page 41 of code) <br /> 6.18.3 Compressor Installation (Refrigerant Recovery Pump) <br /> 6.20.3 Installation Requirements for Cylinders, Equipment,Piping and appliances in Buildings,Building Roofs,and <br /> Exterior Balconies <br /> 6.20.6 Buildings Housing Industrial Occupancies <br /> 7.3 Venting LP-Gas to Atmosphere has been evaluated. Only emergency venting would occur. <br /> NFPA 497 2012 <br /> This standard has been evaluated and listed on page 34 of this report. <br /> International Fire Code 2012 <br /> 5003.9 General safety precautions.General precautions for the safe storage, handling or care of hazardous materials <br /> shall be in accordance with Sections 5003.9.1 through 5003.9.10. <br /> 5003.9.1 Personnel training and written procedures. <br /> Persons responsible for the operation of areas in which hazardous materials are stored,dispensed,handled or used <br /> shall be familiar with the chemical nature of the materials and the appropriate mitigating actions necessary in the <br /> event of fire,leak or spill, <br /> 5003.9.1.1 Fire department liaison.Responsible persons shall be designated and trained to be liaison personnel to <br /> the fire department.These persons shall aid the fire department in preplanning emergency responses and identifying. <br /> the locations where hazardous materials are located,,and shall have access to Material Safety Data Sheets and be <br /> knowledgeable in the site's emergency response procedures. <br /> 5/3/2016 Project: 1604141_BrianKnopf__Extractor Page 31 of 34 <br /> EPE Doc. 160414ER Confidential-Proprietary Document Butane USE ONLY <br />
The URL can be used to link to this page
Your browser does not support the video tag.