My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2916 STATE ST BSNW LLC 2019-04-17
>
Address Records
>
STATE ST
>
2916
>
BSNW LLC
>
2916 STATE ST BSNW LLC 2019-04-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2019 9:52:55 AM
Creation date
4/17/2019 9:52:42 AM
Metadata
Fields
Template:
Address Document
Street Name
STATE ST
Street Number
2916
Tenant Name
BSNW LLC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENO/NEER/NO/PUBLIC SERVICES DEPARTMENT <br /> w� <br /> August 9, 2016 <br /> Brian Knopf <br /> pickensmountainfarm@gmail.com <br /> RE: Owner: Swallwell's First LLC <br /> Job Address: 2916 State St. Ste 102 <br /> Plan Check No: M1608-022 <br /> Dear Mr. Knopf, <br /> In response to your application for a mechanical permit,your plans have been examined and you are <br /> advised that revisions may be necessary before a permit can be issued. Please review and respond to the <br /> comments below. All references refer to the 2012 International Building Code (IBC), the 2012 <br /> International Fire Code (IFC),the 2012 International Mechanical Code(IMC), and the 2012 International <br /> Energy Conservation (IECC), as amended by the State of Washington and adopted by the city of Everett. <br /> The current IBC referenced standard for accessible design is the 2009"Accessible and Usable Buildings <br /> and Facilities"(ICC/ANSI A117.1). Federal ADA, FHA, and HUD regulations and standards, including the <br /> Fair Housing Accessibility Guidelines may be more restrictive. <br /> In order for the processing of your application to continue, it will be necessary to provide the <br /> Building Division with two complete new sets of construction documents reflecting the <br /> corrections requested. <br /> 1. WAC 51-54A-3802.4.5 requires a ventilation rate"for the room to maintain the concentration <br /> of flammable constituents in air below 25% of the lower flammability limit of the respective <br /> solvent."This needsto be verified and specified or the same code section requires Class 1 <br /> Division 11 electrical requirements. <br /> 2. The plans indicate an interlock between the exhaust fan and extraction machine. Interlocks <br /> are also required between the gas detector, emergency power, lighting and all electrical <br /> wiring in accordance with 3802.4.6, 3802.4.7 and 3802.4.8. <br /> 3. IBC 717.5.2 requires a 90 minute fire damper where the supply duct passes through the 2- <br /> hour fire barrier wall. <br /> 4. Since IMC 510 prohibits fire dampers in hazardous exhaust ducts, a shaft around the exhaust <br /> duct is required in accordance with IBC 717.1.1. If the duct passes through the 2-hour fire <br /> barrier wall (as shown), the shaft requires 2-hour protection. If the duct were to pass through <br /> the one- hour ceiling assembly, the duct would need one-hour protection. <br /> 5. The"proposed building rule for butane use"indicates up to 100 pounds of butane in the <br /> extraction room. 3802 limits the amount of butane in the extraction room to that which is in <br /> use(no storage).The IBC limits the amount of butane for the entire building (outside of <br /> control areas) to 150 pounds. Please revise. <br /> Please call me if you have any questions at 425-257-7264. <br /> Please prepare a response letter showing where each item in this correction letter is addressed on the <br /> plan set. <br /> Upon submittal of the drawings, your application will be given priority and plan reviews will recommence. <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 7,,.(25) 257-8800 • Fax (425) 257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.