Laserfiche WebLink
INSPECTION REPORT <br /> Date La / l18__ Permit:ej&O/-o/z <br /> Contractor: / <br /> Owner: __,P0/ en-7 <br /> Site Address: 40_5_____015-74-h Q <br /> f TYPE OF INSPECTION REQUESTED (.0 <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab Grou , ork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In -Hough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Groundings_Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑ rywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> 2PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ O FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> w, <br /> eLIQ. SPC n-Sik <br /> _____A., ‘ <br /> Inspector: Date: <br /> iA. al . j <br /> EIR(10/06) DATABAR,INC. <br />