Laserfiche WebLink
INSPECTION REPORT ` <br /> / ;,,o_Sw .-- „.. <br /> � , Date CJ 25—i(g /1/44 <br /> Contractor: <br /> Owner: tV E / 1L— <br /> Site Address: ego 9 v lc C...To/ \ PL d/ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL , PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final '.---�HWT Final <br /> OTHER OR CONSULTATION: Lit '-z3Z @,e '7 <br /> A PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE A IT <br /> ,❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED r- <br /> , OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: 'af9 —, IV/ <br /> Date: (9.--4, S-- t <br /> EIR(10/06) DATABAR,INC. <br />