My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4409 30TH DR SE 2019-04-18
>
Address Records
>
30TH DR SE
>
4409
>
4409 30TH DR SE 2019-04-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2019 7:47:02 AM
Creation date
4/18/2019 7:46:57 AM
Metadata
Fields
Template:
Address Document
Street Name
30TH DR SE
Street Number
4409
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
//NO ;011" ADHr e-,) <br /> DESIGN FIELD RE <br /> 1 of 2 <br /> Project Name: Everett River Front-Simpson Report: 025 <br /> GeoDesign#: Polygon-127-03 Date: 02/01/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> —ht1,ti1.1 • <br /> a61 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather:Cloudy, 40's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1300/1400 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg <br /> 0 Site Plan(s) 0 Density Test Summary Signature: 4 ‘4 <br /> Attachments: 0 Installation Records 0 Other <br /> Reviewed By: X <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg,was on-site part time at the request of John Feltner with <br /> Polygon to observe the foundation subgrade for Lots 142 and 143. <br /> SUMMARY of OBSERVATIONS: <br /> Lot 142: <br /> Upon arrival, GeoDesign noted that the foundation excavation subcontractor had completed excavation of the footing and <br /> crawl space area for Lot 142. GeoDesign noted that the exposed footing subgrade generally consisted of a gray and brown <br /> silty SAND (f-m)with gravel (f-c) which could generally be penetrated less than 2 inches using a 1/2 inch diameter soil <br /> probe. GeoDesign noted an area in the northwest corner of the lot area which exhibited yielding/pumping underfoot and <br /> could be probed approximately 6 inches to 1 foot. GeoDesign recommended that the area be over-excavated down to firm <br /> and unyielding underlying material, lined with a non-woven geotextile material,and backfilled with with structural fill <br /> material. The affected areas were clearly identified using orange spray paint. <br /> GeoDesign notified the subcontractor and client of our observations prior to our departure from the site today, <br /> Lot 143: <br /> Upon arrival, GeoDesign noted that the foundation excavation subcontractor had completed excavation of the footing and <br /> crawl space area for Lot 143. GeoDesign noted that the exposed footing subgrade generally consisted of a gray and brown <br /> silty SAND(f-m)with gravel (f-c)which could generally be penetrated less than 2 inches using a 1/2 inch diameter soil <br /> probe. GeoDesign noted an area on the west 1/3 of the lot area which could be probed approximately 6 inches to 1.5 foot. <br /> GeoDesign recommended that the area be over-excavated down to firm and unyielding underlying material, lined with a <br /> non-woven geotextile material, and backfilled with with structural fill material. The affected areas were clearly identified ' <br /> using orange spray paint. <br /> GeoDesign notified the subcontractor and client of our observations prior to our departure from the site today. <br /> A summary of our observations can be found in the attached Figure 1. John Feltner with Polygon was notified of our <br /> observations prior to our departure from the site. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and. <br /> specifications throughout the duration of the project Irrespective of the presence of our representative. Ourworic does not include supervision or direction of the contractor;the contractor's employees <br /> or agents.Our firm is not responsible for site safety.This field report Is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report cert only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.