Laserfiche WebLink
- INSPECTION REPORT <br /> , Date 1 La Permit: 0` vS 01.4 <br /> Contractor: <br /> �, (Rb <br /> � <br /> `�tt ttOtttwner: j� <br /> Site Address: .ct 2j E: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab •Graundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In 111.' ough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑ ailing Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHE CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> iL <br /> et( <br /> 10 --i 3 -/7 <br /> c , <br /> Inspector: Date: <br /> EIR(10/06) DA ABAR,INC. <br />