My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3666-19
>
Ordinances
>
Ordinance 3666-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2019 9:28:46 AM
Creation date
4/18/2019 9:09:32 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3666-19
Date
4/3/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance,Stormwater Management Manual, Surface Water Comprehensive Plan,and the City's Design and <br /> Construction Standards and Specifications. Everett's current NPDES permit and regulations mandate a wide <br /> comprehensive plan update. LID is a term used to describe a stormwater management and land development <br /> ---:-. ' - - - - •:- .-: . - : :- site, natural stormwatcr management-features(such as areas <br /> of permeable soils,depressions,or shallow vegetated swalcs),integrated with engineered,small scale hydrologic <br /> controls(such as rain gardens, roof top dispersion,and porous pavements)to more closely mimic <br /> predevelopment hydrologic functions. <br /> have been a problem in the past,and intense flooding of home and businesses during recent storm events have <br /> prompted the programming of major improvements in this s -- •- -:'-: -: . - •-• : :• - ' • - <br /> :• ' : - ----• hat ea e made to prevent further degradation of water quality. <br /> -- • • _ _ -- .- _ •. -- •-gioca-I Stormwater Monitoring Program. This program,developed by <br /> stakeholders from municipalities,tribes,environmental organ' . :- , -. . . . . . .. . _ - <br /> business community,allows municipalities to pay into a pool to implement regional monitoring for status and <br /> - onsultants and stakeholders who bid to do specific projects chosen by the combined <br /> -: :• ::: -: -- - -• r Work Group. The contract and payment process is overseen by an <br /> •--- - - - - = - - --- •- . -- •-- - •- -- - e - _ ---• - •-- • - - -. - - . - <br /> - - - - - : _ s-and-much less cost than each municipality doing monitoring on their own. <br /> a) Everett shall continue to monitor the quality of its surface waters and coordinate with neighboring <br /> Planning Ar a. - <br /> Policy 2.12.24,3 The Puget Sound Action Agenda serves as a roadmap for actions needed for the recovery of <br /> Puget Sound. Many of the actions recommended under the plan are included and implemented under the <br /> NPDES program referred to above.The City shall continue to work with the Puget Sound Partnership to <br /> implement programs and projects that contribute to the recovery of the Sound. <br /> 2.153 Critical Area Goals,Objectives and Policies <br /> Goals for Critical Areas Land Use Policies <br /> Goal 2.11 Protect the functions and values of critical areas in order to promote and protect public health, <br /> safety and welfare. <br /> Goal 2.15.3. To protect,sustain and improve Everett's critical areas for the present and future generations. <br /> Goal 2.15.2 To protect the public health,safety and welfare by regulating development of the geologic and <br /> - -- ' . .. ._ - tially hazardous conditions,including all geologically hazardous areas. <br /> Objective 2.15.1 Require development to protect and preserve critical areas. <br /> LAND USE ELEMENT, 2019 Amendment 38 <br /> Exhibit 1 -Page 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.