My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4415 31ST AVE SE 2019-04-18
>
Address Records
>
31ST AVE SE
>
4415
>
4415 31ST AVE SE 2019-04-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2019 11:33:33 AM
Creation date
4/18/2019 11:33:04 AM
Metadata
Fields
Template:
Address Document
Street Name
31ST AVE SE
Street Number
4415
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD REPORT DFR 050 <br /> [ DESIGN PHOTO LOG Date: 6/16. <br /> L3of4 <br /> . . <br /> m 'ms`s . , . <br /> W. 4. . <br /> )._ <br /> L' Y 4 L. ! 11 <br /> iI.. r G, <br /> ✓, <br /> w"' <br /> ,:: ,. S q <br /> a sd 1 <br /> . ... a <br /> y <br /> r.. <br /> ;y <br /> Comments: Lot 267- Backfilling of western over- Comments: Lot 259-Soft brown sandy SILT with organics <br /> excavated area with railroad ballast material (unsuitable material)encountered for Lot 268 <br /> -- . <br /> . <br /> - . <br /> .i <br /> Comments: Lot 267-Over-excavation of unsuitable Comments: Lot 268- Depth to hard ground for lot area <br /> material for eastern portion of lot area(up to 3 feet). east of the berm material encountered(-3 feet). <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the <br /> contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does <br /> not include supervision or direction of the contractor,the contractor's employees or agents. Our firm is not responsible for site safety. This field report Is a <br /> DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered final upon review of the <br /> GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 981 33 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.