Laserfiche WebLink
GEODESIGN _z FIELD REP 1ORf T <br /> Project Name: 1 Everett River Front-SimpsonReport 054 <br /> GeoDesign#: Polygon-127-03 Date: 07/07/2017 <br /> Reports with Unresolved Nonconformance Issues: I Permit: <br /> PW1505-005 <br /> o <br /> I ....�. .......�. I Nick Ab ( <br /> delnour(Polygon) 1 Randy Allen(City of Everett) ' Weather Clear, 60-70's <br /> t i <br /> 1Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1330/1400 <br /> Distribution: ## <br /> Doug Ross(Polygon) 1 Kirk Keck(City of Everett) <br /> i Paul McKee(City of Everett) i Dave Foster(City of Everett) Prepared By: Ben Weinberg <br /> i 1 L0 Site Plan(s) ❑ Density Test Summary Signature: --a z <br /> Attachments: <br /> ❑ Installation Records 0 Other <br /> € Reviewed By: <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg,was on-site part time at the request of Craig with DDS to <br /> observe the foundation subgrade for Lot 270. <br /> SUMMARY of OBSERVATIONS: <br /> LOT 270: <br /> Today, GeoDesign noted that DDS had completed excavation of the footing and crawl space area for Lot 270. Previously, <br /> GeoDesign observed the removal of unsuitable fill material up to 8 feet below bottom of plan footing within the building area <br /> and replacement with structural fill material. Today, GeoDesign noted that exposed foundation subgrade material consisted <br /> of a gray-brown silty SAND with gravel which could generally be probed less than 2 inches using a 1/2 inch diameter soil <br /> probe. <br /> It is the opinion of GeoDesign that the exposed foundation subgrade observed today is currently suitable for support of the <br /> intended structure. GeoDesign recommends that any surficially loose and/or saturated material be removed from the base <br /> of the foundation area prior to the placement of concrete. <br /> A summary of our observations can be found in the attached Figure 1. <br /> This report presents opinions formed as aresult of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br /> //Id.) <br />