Laserfiche WebLink
INSPECTION REPORT <br /> ,,,,i :*Ai <br /> Date jg////- Permit: 5/765--//4 <br /> Contractor: GLv <br /> Owner: PU !� CJ�1'1 <br /> Site Address: 44/$ 33lf74_� /al 27 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ;❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate 1OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Wate ice <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑leCeiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ctrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ►C PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER IT <br /> • •K FOR T.C.O. ❑ CORRECTION REQUESTED �/ <br /> ❑ OK FOR C.O. ❑ VIOLATION is <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 0 _.___ e:Cie..,/4 —k.C_4711/47( — <br /> / o <br /> Inspector: ` ,J Date: c Air <br /> EIR(10/06) DATABAR,INC. <br />